Loading...
WA9302A-LR 960614G EOTECHNICAL E 10046 Monroe Drive NGINEERING E NVIRONMENTAL · Dallas, Texas 75229 GEE Consultants, Inc. · (214) 352-5433 · Fax (214) 352-6972 GENERAL REPORT - CANCELLATION/STANDBY Report Date Client Project June 14, 1996 City of Coppell 6.0 MG Water Storage Tank Identification Standby Results Scheduled time: Type of service scheduled: Time left lab: Time arrived at job: Time left job: Time returned lab: Total Charged Time: 11:00 am Pier Inspection 10:30 am 11:00 am 2:00 pm 2:30 pm 4.0 Hours Test Date: June 5, 1996 General Report No.: 28 Project No.: 96-0196 Reason: The casings did not cease water entering into the hole from the bottom of 10 foot deep screening wall piers. Superintendent, Bill Bigham, informed redrilling of those piers into the shale, after consulting with the structural engineer. Technician: D.J./C.C. Mr. Larry Davis - City of Coppell Mr. Gary Hendricks - Shimek, Jacobs and Finklea co: