WA9302A-LR 960614G EOTECHNICAL
E
10046 Monroe Drive
NGINEERING
E NVIRONMENTAL
· Dallas, Texas 75229
GEE Consultants, Inc.
· (214) 352-5433 · Fax (214) 352-6972
GENERAL REPORT - CANCELLATION/STANDBY
Report Date
Client
Project
June 14, 1996
City of Coppell
6.0 MG Water Storage Tank
Identification Standby
Results
Scheduled time:
Type of service scheduled:
Time left lab:
Time arrived at job:
Time left job:
Time returned lab:
Total Charged Time:
11:00 am
Pier Inspection
10:30 am
11:00 am
2:00 pm
2:30 pm
4.0 Hours
Test Date: June 5, 1996
General Report No.: 28
Project No.: 96-0196
Reason: The casings did not cease water entering into the hole from the bottom of 10 foot
deep screening wall piers. Superintendent, Bill Bigham, informed redrilling of those piers
into the shale, after consulting with the structural engineer.
Technician: D.J./C.C.
Mr. Larry Davis - City of Coppell
Mr. Gary Hendricks - Shimek, Jacobs and Finklea
co: