Loading...
RE: Sidewalk and RailKeith, Please note the attached markup indicating the desired pedestal/pilaster configuration. Additionally the dimensions for the size and spacing are shown on sheet 88 of the plans. As for the alignment, the face of the rail should follow the face of the rail on the bridge. An alignment was provided for the retaining wall on sheet 24 and detail for this section (wall/trail/rail) is indicated on sheet 87. Yes we do need a ¾ expansion joint between the trail pavement and the top of the block wall. I’ll call you in a few minutes to discuss. Thanks Chris Chris Schmitt, P.E. Principal 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Main 214.988.9913 Direct 903.421.1897 Mobile 214.461.9864 Fax cschmitt@tnpinc.com <mailto:cschmitt@tnpinc.com> From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Tuesday, October 07, 2014 8:22 AM To: Chris Schmitt Cc: Delvin Black; Keith Burkholder Subject: Re: Sidewalk and Rail Chris, I think we can look at this issue when we meet out there. I'm available tomorrow between 11:00 and 1:00 or at 4:00. If tomorrow is too soon, it will need to be next week. Keith Marvin City of Coppell On Oct 7, 2014, at 7:50 AM, "Chris Schmitt" <cschmitt@tnpinc.com <mailto:cschmitt@tnpinc.com> > wrote: Keith, We will review and provide comments. Also, I wanted to provide an updated on the gabion walls at the bridge. We have processed the survey data that we captured last week and are currently working on proposed solutions/modifications. I expect to be ready to meet with you later this week to present our plan. I’ll be in touch to schedule a meeting once I have a better feel on timing. Delvin/Keith – Can you assist with the questions below regarding the bridge rail and sidewalks? Thanks Chris <image003.jpg> Chris Schmitt, P.E. Principal 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Main 214.988.9913 Direct 903.421.1897 Mobile 214.461.9864 Fax cschmitt@tnpinc.com <mailto:cschmitt@tnpinc.com> From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Monday, October 06, 2014 7:14 PM To: Chris Schmitt Subject: Fwd: Sidewalk and Rail See bridge rail questions below. I can fill in some information if needed. Thanks. Keith Marvin City of Coppell Begin forwarded message: From: Lance Smith <lsmith@TiseoPaving.com <mailto:lsmith@TiseoPaving.com> > Date: October 6, 2014 at 1:53:26 PM CDT To: <kmarvin@coppelltx.gov <mailto:kmarvin@coppelltx.gov> > Cc: Robert Caudill <rcaudill@TiseoPaving.com <mailto:rcaudill@TiseoPaving.com> >, Royce Carter <rcarter@tiseopaving.com <mailto:rcarter@tiseopaving.com> >, <roycecarter1@yahoo.com <mailto:roycecarter1@yahoo.com> > Subject: Fwd: Sidewalk and Rail Keith, Please see the request for information below from Iowa regarding the rail as discussed onsite. Thanks Lance Sent from my iPad Begin forwarded message: From: Royce Carter <roycecarter1@yahoo.com <mailto:roycecarter1@yahoo.com> > Date: October 6, 2014 at 12:44:44 PM CDT To: Lance <lsmith@Tiseopaving.com <mailto:lsmith@Tiseopaving.com> >, "rcaudill@tiseopaving.com <mailto:rcaudill@tiseopaving.com> " <rcaudill@tiseopaving.com <mailto:rcaudill@tiseopaving.com> > Subject: Fw: Sidewalk and Rail Sent from Yahoo Mail on Android <https://overview.mail.yahoo.com/mobile/?.src=Android> ________________________________ From: Trent Widmer <twidmer@ibctx.com <mailto:twidmer@ibctx.com> >; To: <roycecarter1@yahoo.com <mailto:roycecarter1@yahoo.com> >; Subject: Sidewalk and Rail Sent: Mon, Oct 6, 2014 3:04:55 PM Royce, Iowa bridge requests more information about the rail on the south west end of our project not on the bridge. Please confirm the size and spacing of pilasters. Please confirm the alignment of the rail. Please confirm that the back of the sidewalk will pour against the block retaining wall with a ¾” expansion joint. Trent Widmer Superintendent Iowa Bridge & Culvert, LC 9100 Hwy 380 Cross Roads, TX 76227 214.347.1219 M 940.440.0099 O 940.440.0079 F 143*100509*5 Nextel twidmer@ibctx.com <mailto:twidmer@ibctx.com> The information in this message may be priviledged, confidential, and protected from disclosure. If you are not the intended recipient, employee, or agent responsible for delivery to intended recipient, any dissemination is strictly prohibited. If you have recieved this communication in error, please notify sender immediatley. Opinions, conclusions and other information in this message, unless otherwise stated, that do not relate to Iowa Bridge & Culvert, LC (IBC) official business, are those of the sender and are neither given or endorsed by IBC.