Loading...
ST9302-LR010529 ALPHA TESTING, INC. MECHANICAL 2209 Wisconsin St., Sutte 100 STABILIZATION / MODIFICATION Dallas, Texas 75229 FINAL MIX 972/620-8911 - 972/263.4937 (Metro) FAX: 972/406-8023 TESTED FOR: CITY OF COPPELL DATE: 05/29/01 COPPELL, TEXAS PROJECT: SANDY LAKE ROAD PROJ. NO. ST 93 OUR REPORT NO: 98881-203B COPPELL, TEXAS AREA OF WORK: STREET PAVING DATE CEMENT [ ] LIME IX ] INITIALLY APPLIED 05/25101 DATE OF FINAL MIXING: 05/29/01 SAMPLE LOCATIONS: % PASSING % PASSING I 314" SlI~VE # 4 SIEVE 1. SANDY LAKE ROAD AT STATION #102+50 100% 72% 2. SANDY LAKE ROAD AT STATION #103+50 100% 70% 3. SANDY LAKE ROAD AT STATION #104+50 100% 75% 4. SANDY LAKE ROAD AT STATION #105+00 100% 75% REMARKS: CC: ED BELL CONSTRUCTION /A~/FI?/TESTI/~G, INC.. Our test results and reports am for the exclusive use of the c ient (and their designated recipients ~)and shall r~ be r. epro?u.ce?, and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our wnRen ~esutls and rep~ apply only to the samples tested and/or ~rved, and are not indicative of the qualities of apparently identical or similar specimens. I ~ ~eotec. hni~.el Fnnineerinn [I Con.~truntion Material.~ T~stino i7 Fnvirnnmental Fnoineednr~ fl Con.~¢dtinn