Belmont-LR140916Hooper Testing Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavecon Public Works, LP
PROJECT: Belmont Landing
Coppell, TX
LOCATION OF POUR:
JOB NO.: 14.1033
DATE: 16 September 2414
WEATHER: Cloudy
74-88°F
SET 1: Paving: stamped concrete at west side of crossover on Belt Line Rd.,
south half of pour
SET 2:
SAMPLE DATA: SET 1 SET 2
SUPPLIER: Argos
Truck No.
6022
Mix No.:
1391
Ticket No.
1490894
Plant No.:
111
Time Batched
8:40 AM
Time Sampled
10:38 AM
Time Start:
8:00 AM
Concrete Temp.
(ASTM C1064)
93*F
Air Content
(ASTM C231)
3.2%
Time Finished:
12:00 N
Unit Weight
(ASTM 0138)
Concrete Placed;
NIA
COMPRESSIVE STRENGTH TESTS
(ASTM C31, C39)
(Standard 4" x 8" or 6" x 12" cylinder)
Cylinder
Slump
Age
Test
Total Load
Compressive
Required
Number
Inches
Days
Date
Pounds
Strength
28 -Day
(ASTM C143)
psi
Strength
109
6.00
7
9/23/2414
37,100
2950
110
6.00
7
9/23/2014
37,400
2980
111
6.00
28
10/14/2014
47,600
3790
112
6.00
28
14/14/2014
48,300
3840
28 -Day Average
3820
3000*
*4000 psi mix used.
TECHNICIAN: SET 1 - RLJ SET 2 - la�
REMARKS: Scheduled concrete for 9:00am arrived at 10:14arn. Color agent was added on jobsite.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Testing Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavecon Public Works, LP
PROJECT: Belmont Landing
Coppell, TX
LOCATION OF POUR:
JOB NO.: 14.1033
DATE: 17 September 2014
WEATHER: Partly Cloudy
79OF
SET 1: Paving: stamped concrete for Belt Line Rd. median @ east side of
crossover: 0'-15' west of east edge @ 0'-25' north of south curbline
SET 2:
SAMPLE DATA:
SET 1
SET 2
SUPPLIER:
Argos
Truck No.
7098
Mix No.:
1395
Ticket No.
1491913
Plant No.:
110
Time Batched
8:25 AM
Time Sampled
9:15 AM
Time Start:
8:00 AM
Concrete Temp.
(ASTM C1064)
88°F
Air Content
(ASTM 0231)
3.5%
Time Finished:
10:30 AM
Unit Weight
(ASTM 0138)
concrete Placed:
NIA
COMPRESSIVE STRENGTH TESTS
(ASTM C31, C39)
Standard 4" x B" or 6" x 12" cylinder)
Cylinder
Slump
Age
Test
Total Load
Compressive
Required
Number
Inches
Days
Date
Pounds
Strength
28 -Day
(ASTM C143)
psi
Strength
113
5.25
7
9/24/2014
53,300
4240
114
5.25
7
9/24/2014
56,200
4470
115
5.25
28
10/15/2014
65,400
5200
116
5.25
28
10115/2014
68,300
5440
28 -Day Average
5320
3000*
*4000 psi mix used.
TECHNICIAN: SET 1 - RJW SET 2 -
REMARKS: Color agent was added at jobsite.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351.-6419 Fax (214) 351-5148