Loading...
Belmont-LR140905Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX LOCATION OF POUR: JOB NO,: 14.1033 DATE: 5 September 2014 WEATHER: Clear 80-96O F SET 1: Paving westbound left turn lane on Belt Line Rd., 75'-125' west of east end SET 2: Paving, crossover @ 60'-90' west of east left turn lane and 0'-10' north of eastbound existing paving SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 8029 4219 Mix No.: 8275 Ticket No. 2437597 2438115 Plant No.: 141,131 Time Batched 7:40 AM 9:34 AM Time Sampled 8:38 AM 10:24 AM Time Start: 6:30 AM Concrete Temp, (ASTM 01064) 91 °F 92°F Air Content (ASTM 0231) 4.1% 4.1% Time Finished: 3:00 PM Unit Weight (ASTM C138) Concrete Placed: 230 cy COMPRESSIVE STRENGTH TESTS [ASTM C31, C39) (Standard 4" x 8" or 6" x 12" cylinder Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM 0143) psi Strength 93 3.75 7 9112/2014 53,200 4230 94 3.75 7 9/12/2014 53,000 4220 95 3.75 28 1013!2014 63,000 5010 96 3.75 28 10/3/2014 64,000 5100 28 -Day Average 5010 3600 97 5.50 7 9/12/2014 44,300 3530 98 5.50 7 9/12/2014 48,400 3850 99 5.50 28 10/3/2014 59,800 4760 100 5.50 28 1013/2014 58,200 4630 28 -Day Average 4700 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: Scheduled concrete for 7:00am. Concrete arrived at 8:00am. �� 601 Client's foreman advised of test results. 2870 Walnut Hili Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX LOCATION OF POUR: JOB NO.: 14.1033 DATE: 5 September 2014 WEATHER: Clear 80-96°F SET 1: Paving deceleration lane @ eastbound Belt Line Rd., approx. 42'-60' west of approach and south curbline to existing paving SET 2: Paving approach to addition @ 0'-20' weest of east end and 0'-20' north of south end SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 5.25 8029 3866 Mix No.: (see page 1) Ticket No. 5.25 2438634 2438857 Plant No.: (see page 1) Time Batched 5.25 11:36 AM 12:35 PM 63,500 5050 Time Sampled 5.25 12:42 PM 1:25 PM Time Start: (see page 1 } Concrete Temp, (ASTM C1 064) 96°F 970F 28 -Day Average 5100 3600 Air Content (ASTM 0231) 4.0% 4.0% Time Finished, (see page 1) Unit Weight (ASTM C1 38) 7 9/12/2014 47,200 3760 107 5.50 28 10/312014 Concrete Placed: (see page 1 } COMPRESSIVE STRENGTH TESTS (ASTM 031, 039) (Standard 4" x 8" or 6" x 12" cylinder Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM 0143) psi Strength 101 5.25 7 9/12/2014 52,800 4200 102 5.25 7 9/12/2014 52,300 4160 103 5.25 28 10/3/2014 63,500 5050 104 5.25 28 10/3/2014 64,600 5140 28 -Day Average 5100 3600 105 5.50 7 9/1212014 46,400 3690 106 5.50 7 9/12/2014 47,200 3760 107 5.50 28 10/312014 54,500 4340 108 5.50 28 10/3/2014 60,000 4780 28 -Day Average 4550 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: 2B70 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148