Loading...
Belmont-LR140918Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 14.1033 CLIENT: Pavecon Public !Works, LP DATE: 18 September 2014 PROJECT: Belmont Landing WEATHER: Cloudy Coppell, TX 76-88°F LOCATION OF POUR: SET 1: Paving crosswalk on Preakness Lane, 18'-30' south of Beit Line Rd. and east to west curbliine SET 2: SAMPLE DATA: SET 1 SET 2 SUPPLIER: Argos Truck No, 5017 Mix No.: 1395 Ticket No. 1492842 Plant No.: 114 Time Batched 8:27 AM Time Sampled 9:25 AM Time Start: 8:30 AM Concrete Temp. (ASTM! C1064) 92°F Air Content (ASTM 0231) 4.0% Time Finished: 11:00 AM Unit Weight (ASTM 0138) Concrete Placed: NIA COMPRESSIVE STRENGTH TESTS (ASTM C31, C39) (Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM 0143) psi Strength 117 5.00 7 9/25/2014 49,800 3960 118 5.04 7 9/25/2414 50,800 4040 119 5.00 28 10/18/2014 120 5.00 28 14/18/2014 28 -Day Average 3600* *4000 psi mix used. TECHNICIAN: SET 1 - RLJ SET 2 - REMARKS: Color agent was added at jobsite. 4��9. V-�� 2870 Walnut Hill Lame Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 14.1033 CLIENT: Pavecon Public Works, LP DATE: 28 August 2014 PROJECT: Belmont Landing WEATHER: Partly Cloudy Coppell, TX 70-96°F LOCATION OF POUR: 141,131 SET 1: Paving Saratoga Way, westbound lane @ Station 7+68 to 7+88 and 0'-10' south of north curbline 5.25 SET 2. Paving Saratoga Way, westbound lane c@ Station 9+50 to 9+75 and 0'-20' south of north curbline SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 4212 3867 Mix No.: 8275 Ticket No. 2425321 2425787 Plant No.: 141,131 Time Batched 6:26 AM 8:27 AM 5.25 28 Time Sampled 7:05 AM ROB AM Time Start: 6:00 AM Concrete Temp. (ASTM C1064) B9°F 90°F 4970 Air Content (ASTM C231) 4.4% 4.4% Time Finished: 4:00 PM Unit Weight (ASTM C1 38) 5.00 7 9/4/2014 53,500 Concrete Placed: N/A COMPRESSIVE STRENGTH TESTS [ASTM C31, C39] (Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 73 5.25 7 91412014 53,100 4230 74 5.25 7 914!2014 52,700 4190 75 5.25 28 9/25/2014 63,000 5010 76 5.25 28 912512+014 62,400 4970 28 -Day Average 4990 3600 77 5.00 7 9/4/2014 53,500 4264 78 5.00 7 914!2014 52,900 4210 79 5.00 28 9/25/2014 66,200 5270 80 5.00 28 9/25/2014 62,600 4980 28 -Day Average 5130 3600 TECHNICIAN: SET 1 - RI -J SET 2 - RLJ REMARKS: Contractor advised of all test results. 2870 Walnut Hill Lane Dallas, Texas 76229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX LOCATION OF POUR: JOB NO.: 14.1033 DATE: 28 August 2014 WEATHER: Partly Cloudy 70-96°F SET 1: Paving parallel parking spaces on Preakness Lane @ Station 0+57 to Station 0+99 and 0'-15' west of east curbline SET 2: Paving parallel parking spaces on Prescott Lane @ Station 2+45 to Station 2+75 and 0'-15' east of west curbline SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 4884 8003 Mix No.: 8275 Ticket No, 2426547 2427139 Plant No.: (see page 1) Time Batched 11:14 AM 2:05 PM Time Sampled 11:56 AM 2:42 PM Time Start: (see page 1) Concrete Temp, (ASTM G1064) 94°F 95°F Air Content (ASTM C231) 4.2% 4.6% Time Finished: (see page 1) Unit Weight (ASTM 0138) Concrete Placed: N/A COMPRESSIVE STRENGTH TESTS ASTM C31 C39) (Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 81 5.25 7 9!412014 49,900 3970 82 5.25 7 9/4/2014 50,600 4030 83 5.25 28 9/25/2014 61,000 4850 84 5.25 28 9/25/2414 64,500 5130 28 -Day Average 4940 3600 85 6.00 7 9/4/2014 48,400 3850 86 6.00 7 9/4/2014 48,900 3890 87 6.00 28 9/2512014 58,900 4690 88 6.00 28 9/25/2014 59,000 4700 28 -Day Average 4700 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: Contractor advised of all test results. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148