Belmont-LR140918Hooper Testing Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 14.1033
CLIENT: Pavecon Public !Works, LP DATE: 18 September 2014
PROJECT: Belmont Landing WEATHER: Cloudy
Coppell, TX 76-88°F
LOCATION OF POUR:
SET 1: Paving crosswalk on Preakness Lane, 18'-30' south of Beit Line Rd.
and east to west curbliine
SET 2:
SAMPLE DATA:
SET 1
SET 2
SUPPLIER:
Argos
Truck No,
5017
Mix No.:
1395
Ticket No.
1492842
Plant No.:
114
Time Batched
8:27 AM
Time Sampled
9:25 AM
Time Start:
8:30 AM
Concrete Temp.
(ASTM! C1064)
92°F
Air Content
(ASTM 0231)
4.0%
Time Finished:
11:00 AM
Unit Weight
(ASTM 0138)
Concrete Placed:
NIA
COMPRESSIVE STRENGTH TESTS
(ASTM C31, C39)
(Standard 4" x 8" or 6" x 12" cylinder)
Cylinder
Slump
Age
Test
Total Load
Compressive
Required
Number
Inches
Days
Date
Pounds
Strength
28 -Day
(ASTM 0143)
psi
Strength
117
5.00
7
9/25/2014
49,800
3960
118
5.04
7
9/25/2414
50,800
4040
119
5.00
28
10/18/2014
120
5.00
28
14/18/2014
28 -Day Average
3600*
*4000 psi mix used.
TECHNICIAN: SET 1 - RLJ SET 2 -
REMARKS: Color agent was added at jobsite.
4��9. V-��
2870 Walnut Hill Lame Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Testing Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
JOB NO.: 14.1033
CLIENT: Pavecon Public Works, LP
DATE: 28 August 2014
PROJECT: Belmont Landing
WEATHER: Partly Cloudy
Coppell, TX
70-96°F
LOCATION OF POUR:
141,131
SET 1: Paving Saratoga Way, westbound lane
@ Station 7+68 to 7+88 and
0'-10' south of north curbline
5.25
SET 2. Paving Saratoga Way, westbound lane c@ Station 9+50 to 9+75 and
0'-20' south of north curbline
SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI
Truck No.
4212
3867
Mix No.:
8275
Ticket No.
2425321
2425787
Plant No.:
141,131
Time Batched
6:26 AM
8:27 AM
5.25
28
Time Sampled
7:05 AM
ROB AM
Time Start:
6:00 AM
Concrete Temp. (ASTM C1064)
B9°F
90°F
4970
Air Content (ASTM C231)
4.4%
4.4%
Time Finished:
4:00 PM
Unit Weight (ASTM C1 38)
5.00
7
9/4/2014
53,500
Concrete Placed: N/A
COMPRESSIVE STRENGTH TESTS [ASTM C31, C39] (Standard 4" x 8" or 6" x 12" cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28 -Day
(ASTM C143) psi Strength
73
5.25
7
91412014
53,100
4230
74
5.25
7
914!2014
52,700
4190
75
5.25
28
9/25/2014
63,000
5010
76
5.25
28
912512+014
62,400
4970
28 -Day Average
4990 3600
77
5.00
7
9/4/2014
53,500
4264
78
5.00
7
914!2014
52,900
4210
79
5.00
28
9/25/2014
66,200
5270
80
5.00
28
9/25/2014
62,600
4980
28 -Day Average
5130 3600
TECHNICIAN: SET 1 - RI -J SET 2 - RLJ
REMARKS: Contractor advised of all test results.
2870 Walnut Hill Lane Dallas, Texas 76229 (214) 351-6419 Fax (214) 351-5148
Hooper Testing Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavecon Public Works, LP
PROJECT: Belmont Landing
Coppell, TX
LOCATION OF POUR:
JOB NO.: 14.1033
DATE: 28 August 2014
WEATHER: Partly Cloudy
70-96°F
SET 1: Paving parallel parking spaces on Preakness Lane @ Station 0+57 to
Station 0+99 and 0'-15' west of east curbline
SET 2: Paving parallel parking spaces on Prescott Lane @ Station 2+45 to
Station 2+75 and 0'-15' east of west curbline
SAMPLE DATA:
SET 1
SET 2
SUPPLIER:
TXI
Truck No.
4884
8003
Mix No.:
8275
Ticket No,
2426547
2427139
Plant No.:
(see page 1)
Time Batched
11:14 AM
2:05 PM
Time Sampled
11:56 AM
2:42 PM
Time Start:
(see page 1)
Concrete Temp,
(ASTM G1064)
94°F
95°F
Air Content
(ASTM C231)
4.2%
4.6%
Time Finished:
(see page 1)
Unit Weight
(ASTM 0138)
Concrete Placed:
N/A
COMPRESSIVE STRENGTH TESTS
ASTM C31 C39)
(Standard 4" x 8" or 6" x 12"
cylinder)
Cylinder
Slump
Age
Test
Total Load
Compressive
Required
Number
Inches
Days
Date
Pounds
Strength
28 -Day
(ASTM C143)
psi
Strength
81
5.25
7
9!412014
49,900
3970
82
5.25
7
9/4/2014
50,600
4030
83
5.25
28
9/25/2014
61,000
4850
84
5.25
28
9/25/2414
64,500
5130
28 -Day Average
4940
3600
85
6.00
7
9/4/2014
48,400
3850
86
6.00
7
9/4/2014
48,900
3890
87
6.00
28
9/2512014
58,900
4690
88
6.00
28
9/25/2014
59,000
4700
28 -Day Average
4700
3600
TECHNICIAN: SET 1 - RLJ SET 2 - RLJ
REMARKS: Contractor advised of all test results.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148