Belmont-LR140916 (2)Hooper Testing Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
JOB NO.: 14.1033
CLIENT: Pavecon Public Works, LP
DATE: 16 September 2014
PROJECT: Belmont Landing
WEATHER: Cloudy
Coppell, TX
74-88°F
LOCATION OF POUR:
93°F
SET 1: Paving: stamped concrete at west
side of crossover on Belt Line Rd.,
south half of pour
Age
SET 2:
SAMPLE DATA: SET 1
Truck No_
6022
Ticket No.
1490894
Time Batched
8:40 AM
Time Sampled
10:38 AM
Concrete Temp. (ASTM C1064)
93°F
Air Content (ASTM 0231)
3.2%
Unit Weight (ASTM 0138)
Age
SET 2 SUPPLIER: Argos
Mix No.: 1391
Plant No.: 111
Time start: 8:00 AM
Time Finished: 12:00 N
4000 psi mix used.
TECHNICIAN: SET 1 - RLJ SET 2 - la'�
REMARKS: Scheduled concrete for 9:00am arrived at 10:14am. Color agent was added on jobsite.
2870 Walnut HIII Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Concrete Placed:
N/A
COMPRESSIVE STRENGTH TESTS
(ASTM C31, C39)
(Standard 4" x 8" or G" x 12"
cylinder)
Cylinder
Slump
Age
Test
Total Load
Compressive
Required
Number
Inches
Days
Date
Pounds
Strength
28 -Day
,ASTM C143
51
Strength
109
6.00
7
9/23/2014
37,100
2950
110
6.00
7
9/23/2014
37,400
2980
111
6.00
28
10/14/2014
112
6.00
28
10114/2014
28 -Day Average
3000*
4000 psi mix used.
TECHNICIAN: SET 1 - RLJ SET 2 - la'�
REMARKS: Scheduled concrete for 9:00am arrived at 10:14am. Color agent was added on jobsite.
2870 Walnut HIII Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Testing Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 14.1033
CLIENT: Pavecon Public Works, LP DATE: 17 September 2014
PROJECT: Belmont Landing
Coppell, TX
LOCATION OF POUR:
WEATHER: Partly Cloudy
790F
SET 1: Paving: stamped concrete for Belt Line Rd. median @ east side of
crossover: 0'-15' west of east edge @ 0'-25' north of south curbline
SET 2:
SAMPLE DATA: SET 1
Truck No.
7098
Ticket No.
1491913
Time Batched
8:25 AM
Time Sampled
9:15 AM
Concrete Temp. (ASTM C1064)
88°F
Air Content (ASTM C231)
3.5%
Unit Weight (ASTM 0138)
SET 2 SUPPLIER: Argos
Mix No.: 1395
Plant No.: 110
Time Start: 8:00 AM
Time Finished: 10:30 AM
Concrete Placed: NIA
COMPRESSIVE STRENGTH TESTS [ASTM C31, C39] (Standard 4" x 8" or 6" x 12" cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28 -Day
(ASTM 0143) psi Strength
113
5.25
7
114
5.25
7
115
5.25
28
116
5.25
28
*4000 psi mix used.
9/24/2014 53,300 4240
9/24/2014 56;200 4470
10/15/2014
10/15/2014
28 -Day Average
3000*
TECHNICIAN: SET 1 - RJW SET 2 -
REMARKS: Color agent was added at jobsite.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148