Loading...
Belmont-LR140916 (2)Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 14.1033 CLIENT: Pavecon Public Works, LP DATE: 16 September 2014 PROJECT: Belmont Landing WEATHER: Cloudy Coppell, TX 74-88°F LOCATION OF POUR: 93°F SET 1: Paving: stamped concrete at west side of crossover on Belt Line Rd., south half of pour Age SET 2: SAMPLE DATA: SET 1 Truck No_ 6022 Ticket No. 1490894 Time Batched 8:40 AM Time Sampled 10:38 AM Concrete Temp. (ASTM C1064) 93°F Air Content (ASTM 0231) 3.2% Unit Weight (ASTM 0138) Age SET 2 SUPPLIER: Argos Mix No.: 1391 Plant No.: 111 Time start: 8:00 AM Time Finished: 12:00 N 4000 psi mix used. TECHNICIAN: SET 1 - RLJ SET 2 - la'� REMARKS: Scheduled concrete for 9:00am arrived at 10:14am. Color agent was added on jobsite. 2870 Walnut HIII Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Concrete Placed: N/A COMPRESSIVE STRENGTH TESTS (ASTM C31, C39) (Standard 4" x 8" or G" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day ,ASTM C143 51 Strength 109 6.00 7 9/23/2014 37,100 2950 110 6.00 7 9/23/2014 37,400 2980 111 6.00 28 10/14/2014 112 6.00 28 10114/2014 28 -Day Average 3000* 4000 psi mix used. TECHNICIAN: SET 1 - RLJ SET 2 - la'� REMARKS: Scheduled concrete for 9:00am arrived at 10:14am. Color agent was added on jobsite. 2870 Walnut HIII Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 14.1033 CLIENT: Pavecon Public Works, LP DATE: 17 September 2014 PROJECT: Belmont Landing Coppell, TX LOCATION OF POUR: WEATHER: Partly Cloudy 790F SET 1: Paving: stamped concrete for Belt Line Rd. median @ east side of crossover: 0'-15' west of east edge @ 0'-25' north of south curbline SET 2: SAMPLE DATA: SET 1 Truck No. 7098 Ticket No. 1491913 Time Batched 8:25 AM Time Sampled 9:15 AM Concrete Temp. (ASTM C1064) 88°F Air Content (ASTM C231) 3.5% Unit Weight (ASTM 0138) SET 2 SUPPLIER: Argos Mix No.: 1395 Plant No.: 110 Time Start: 8:00 AM Time Finished: 10:30 AM Concrete Placed: NIA COMPRESSIVE STRENGTH TESTS [ASTM C31, C39] (Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM 0143) psi Strength 113 5.25 7 114 5.25 7 115 5.25 28 116 5.25 28 *4000 psi mix used. 9/24/2014 53,300 4240 9/24/2014 56;200 4470 10/15/2014 10/15/2014 28 -Day Average 3000* TECHNICIAN: SET 1 - RJW SET 2 - REMARKS: Color agent was added at jobsite. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148