Belmont-LR170905Hooper Testing Laboratories, Inc,
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 14.1033
CLIENT: Pavecon Public Works, LP DATE: 5 September 2014
PROJECT: Belmont Landing WEATHER: Clear
Coppell, TX 80-96°F
LOCATION OF POUR:
SET 1: Paving westbound left turn lane on Belt Line Rd., 75'-125' west of
east end
SET 2: Paving. crossover @ 60'-90' west of east left turn lane and 0'-10'
north of eastbound existing paving
SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI
Truck No.
8029
4219
Mix No.:
8275
Ticket No.
2437597
2438115
Plant No.:
141,131
Time Batched
7:40 AM
9:34 AM
Time Sampled
8:38 AM
10:24 AM
Time Start:
5:30 AM
Concrete Temp.
(ASTM C1064)
91'F
92"F
Air Content
(ASTM C231)
4.1%
4A%
Time Finished:
3:00 PM
Unit Weight
(ASTM C138)
Concrete Placed:
230 cy
COMPRESSIVE STRENGTH TESTS
(ASTM C31, c39)
(Standard 4" x 8" or 6" x 12" cylinder)
Cylinder
Slump
Age
Test
Total Load
Compressive
Required
Number
Inches
Days
Date
Pounds
Strength
28 -Day
(ASTM 0143)
psi
Strength
93
3.75
7
9112/2014
53,200
4230
94
3.75
7
9/12/2014
53;000
4220
95
3.75
28
10/312014
95
3.75
28
10/3/2014
28 -Day Average
3600
97
5.50
7
9/12/2014
44,300
3530
98
5.50
7
9/12/2014
48,400
3850
99
5.50
28
10!312014
100
5.50
28
10/3/2014
28 -Day Average
3600
TECHNICIAN: SET 1 - RLJ SET 2 - RLJ
REMARKS: Scheduled concrete for 7:00am. Concrete arrived at 8:00am. 4,011L /Ciol
Client's foreman advised of test results.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Testing Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 14.1033
CLIENT: Pavecon Public Works, LP DATE: 5 September 2014
PROJECT: Belmont Landing WEATHER: Clear
Coppell, TX 80-96°F
LOCATION OF POUR:
SET 1: Paving deceleration lane @ eastbound Belt Line Rd., approx. 42'-60'
west of approach and south curbline to existing paving
SET 2: Paving approach to addition @ 0'-20' weest of east end and 0'-20'
north of south end
SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI
Truck No.
5.25
8029
3866
Mix No.:
(see page 1 )
7
Ticket No.
103
2438634
2438857
Plant No.:
(see page 1 }
5.25
Time Batched
10/3/2014
11:36 AM
12:35 PM
7
9/12/2014
106
Time Sampled
7
12:42 PM
1:25 PM
Time Start:
(see page 1 }
10/3/2014
Concrete Temp.
(ASTM cim4)
96°F
97°F
Air Content
(ASTM C231)
4.0%
4.0%
Time Finished:
(see page 1 }
Unit Weight
(ASTM C138)
Concrete Placed:
(see page 1 }
COMPRESSIVE STRENGTH TESTS
(ASTM C31, C39)
_(Standard
4" x 8" or 6" x 12"
cylinder
Cylinder
Slump
Age
Test
Total Load
Compressive
Required
Number
Inches
Days
Date
Pounds
Strength
28 -Day
(ASTM C143)
psi
Strength
101
5.25
7
9/1212014
102
5.25
7
9/12/2014
103
5.25
28
1013!2014
104
5.25
28
10/3/2014
105
5.50
7
9/12/2014
106
5.50
7
9/12/2014
107
5.50
28
10/3/2014
108
5.50
28
10/3/2014
52,800 4200
52,300 4160
28 -Day Average 3600
46,400 3690
47;200 3760
28 -Day Average 3600
TECHNICIAN: SET 1 - RLJ SET 2 - RL!
REMARKS:
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-8419 Fax (214) 351-5148
Hooper Testing Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavecon Public Works, LP
PROJECT: Belmont Landing
Coppell, TX
LOCATION OF POUR:
SET 1: Paving: Saratoga Way @ Station 2+60
JOB NO.: 14.1433
DATE: 15 August 2014
WEATHER: Clear, 74-98°F
SET 2: Paving: Saratoga Way @ Station 1+50
SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI
Truck No.
4862
4884
Mix No.:
8274SF
Ticket No.
2401915
2402064
Plant No.:
131,128
Time Batched
6:11 AM
6:53 AM
Time Sampled
5:50 AM
7:26 AM
Time Start:
8:00 AM
Concrete Temp.
(ASTM C1064)
91'F
89°F
Air Content
(ASTM C231)
4.4%
4.3%
Time Finished:
12:30 PM
Unit Weight
(ASTM C1 38)
Concrete Placed:
620 cy
COMPRESSIVE
STRENGTH TESTS
ASTM C31, C39)
Standard 4" x 8" or 6" x 12"
c linden
Cylinder
Slump
Age
Test
Total Load
Compressive
Required
Number
Inches
Days
Date
Pounds
Strength
28 -Day
ASTM C143
SI
Stren th
33
4.75
7
8/22/2014
61,100
4860
34
4.75
7
8/22/2014
56,400
4490
35
4.75
28
9/1212014
68,500
5450
36
4.75
28
9/12/2014
68,400
5440
28 -Day Average
5450
3$00
37
4.00
7
8/22/2014
53,800
4280
38
4.00
7
8/22/2014
53,100
4230
39
4.00
28
9112/2014
59,600
4740
40
4.00
28
9/12/2014
57,800
4600
28 -Day Average
4670
3600
TECHNICIAN: SET 1 - RLJ SET 2 - RLJ
REMARKS:
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper "testing Laboratories, Inc,
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavecon Public Works, LP
PROJECT: Belmont Landing
Coppell, TX
LOCATION OF POUR:
JOB NO.: 14.1033
❑ATE: 15 August 2014
WEATHER: Clear, 74-98°F
SET 1: Paving: Saratoga Way L7a Station 0+57
SET 2: Paving: Prescott Lane @ Station 4+70
SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI
Truck No.
3854
4862
Mix No.:
8274SF
Ticket No.
2402267
2402495
Plant No.;
(see page 1 )
Time Batched
7:30 AM
8:22 AM
Time Sampled
7:58 AM
8:56 AM
Time Start:
(See page 1)
Concrete Temp.
(ASTM Ciorw
89'F
91"F
Air Content
(ASTM 0231)
4.4%
4.3%
Time Finished:
(see page 1)
Unit Weight
(ASTM C138)
Concrete Placed:
(see page 1)
COMPRESSIVE STRENGTH TESTS
ASTM C31, C39
Standard 4" x 8" or 6" x 12"
cylinder)
Cylinder
Slump
Age
Test
Total Load
Compressive
Required
Number
Inches
Days
Date
Pounds
Strength
28 -Day
(ASTM C143psi
Strength
41
4.00
7
8/2212014
53,400
4250
42
4.00
7
8/22/2014
56,200
4470
43
4.00
28
9/12/2014
66,600
5300
44
4.00
28
911212014
66,000
5250
28 -Day Average
5280
3600
45
4.00
7
8122/2014
57,100
4540
45
4.00
7
8/22/2014
60,400
4810
47
4.00
28
9/1212014
68,800
5480
48
4.00
28
9/12/2014
70,700
5630
28 -Day Average
5560
3600
TECHNICIAN: SET 1 - RLJ SET 2 - RLJ
REMARKS:
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Testing Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 14.1033
CLIENT: Pavecon Public Works, LP DATE: 15 August 2014
PROJECT: Belmont Landing WEATHER: Clear, 74-98°F
Coppell, TX
LOCATION OF POUR:
SET 1: Paving: Prescott Lane @ Station 3+60
SET 2: Paving: Prescott Lane @ Station 2+25
SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI
Truck No.
6006
6018
Mix No.:
8274SF
Ticket No.
2402657
2402872
Plant No.:
(see page 1)
Time Batched
8:50 AM
9:43 AM
Time Sampled
9:41 AM
10:16 AM
Time Start:
(see page 1)
Concrete Temp.
(ASTMC1064)
88"F
91 OF
Air Content
(ASTM C231)
4.0%
4.4%
Time Finished:
(see page 1 )
Unit Weight
(ASTM C138)
Concrete Placed:
(see page 1)
COMPRESSIVE STRENGTH TESTSA(
STM C31, C39)
(Standard 4" x 8" or 6" x 12"
c linder
Cylinder
Slump
Age
Test
Total Load
Compressive
Required
Number
Inches
Days
Date
Pounds
Strength
28 -Day
(ASTM C143)
sl
Strength
49
4.50
7
8/22/2014
52,900
4210
50
4.50
7
8/22/2014
52,000
4140
51
4.50
28
9/12/2014
58,000
4620
52
4.50
28
911212014
59,000
4700
28 -Day Average
4664
3600
53
3.75
7
8/2212014
57,300
4560
54
3.75
7
8/22/2014
56,400
4490
55
3.75
28
9/1212014
68,400
5440
56
3.75
28
9/1212014
68,500
5450
28 -Day Average
5450
3600
TECHNICIAN: SET 1 - RL.I SET 2 - Rl..]
REMARKS:
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Testing Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavecon Public Works, LP
PROJECT: Belmont Landing
Coppell, TX
LOCATION OF POUR:
SET 1: Paving: Prescott Lane @ Station 1+05
SET 2:
SAMPLE DATA:
SET 1 SET 2
Truck No.
6006
Ticket No.
2403031
Time Batched
10:24 AM
Time Sampled
11:27 AM
Concrete Temp. (ASTM 01064)
93"F
Air Content (ASTM 0231)
4.2%
Unit Weight (ASTM C138)
Strength
JOB NO.: 14.1033
DATE: 15 August 2014
WEATHER: Clear, 74-98°F
SUPPLIER: TXI
Mix No.: 8274SF
Plant No.: (see page 1)
Time Start: (see page 1)
Time Finished: (see page 1)
Concrete Placed: (see page 1)
COMPRESSIVE STRENGTH TESTS
ASTM C31 Cas
Standard 4" x 8" or 6" x 12" cylinder
Cylinder
Slump
Age
Test
Total Load
Compressive
Required
Number
Inches
Days
Date
Pounds
Strength
28 -Day
ASTM C143psi
Strength
57
3.75
7
8/22/2014
52,300
4240
58
3.75
7
8/22/2014
49,600
3950
59
3.75
28
9/12/2014
57,100
4540
60
3.75
28
9/12/2014
62,300
4960
28 -Day Average
4750
3600
TECHNICIAN: SET 1 - RLJ SET 2 -
REMARKS:
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-8419 Fax (214) 351-5148