Loading...
Belmont-LR170905Hooper Testing Laboratories, Inc, Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 14.1033 CLIENT: Pavecon Public Works, LP DATE: 5 September 2014 PROJECT: Belmont Landing WEATHER: Clear Coppell, TX 80-96°F LOCATION OF POUR: SET 1: Paving westbound left turn lane on Belt Line Rd., 75'-125' west of east end SET 2: Paving. crossover @ 60'-90' west of east left turn lane and 0'-10' north of eastbound existing paving SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 8029 4219 Mix No.: 8275 Ticket No. 2437597 2438115 Plant No.: 141,131 Time Batched 7:40 AM 9:34 AM Time Sampled 8:38 AM 10:24 AM Time Start: 5:30 AM Concrete Temp. (ASTM C1064) 91'F 92"F Air Content (ASTM C231) 4.1% 4A% Time Finished: 3:00 PM Unit Weight (ASTM C138) Concrete Placed: 230 cy COMPRESSIVE STRENGTH TESTS (ASTM C31, c39) (Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM 0143) psi Strength 93 3.75 7 9112/2014 53,200 4230 94 3.75 7 9/12/2014 53;000 4220 95 3.75 28 10/312014 95 3.75 28 10/3/2014 28 -Day Average 3600 97 5.50 7 9/12/2014 44,300 3530 98 5.50 7 9/12/2014 48,400 3850 99 5.50 28 10!312014 100 5.50 28 10/3/2014 28 -Day Average 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: Scheduled concrete for 7:00am. Concrete arrived at 8:00am. 4,011L /Ciol Client's foreman advised of test results. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 14.1033 CLIENT: Pavecon Public Works, LP DATE: 5 September 2014 PROJECT: Belmont Landing WEATHER: Clear Coppell, TX 80-96°F LOCATION OF POUR: SET 1: Paving deceleration lane @ eastbound Belt Line Rd., approx. 42'-60' west of approach and south curbline to existing paving SET 2: Paving approach to addition @ 0'-20' weest of east end and 0'-20' north of south end SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 5.25 8029 3866 Mix No.: (see page 1 ) 7 Ticket No. 103 2438634 2438857 Plant No.: (see page 1 } 5.25 Time Batched 10/3/2014 11:36 AM 12:35 PM 7 9/12/2014 106 Time Sampled 7 12:42 PM 1:25 PM Time Start: (see page 1 } 10/3/2014 Concrete Temp. (ASTM cim4) 96°F 97°F Air Content (ASTM C231) 4.0% 4.0% Time Finished: (see page 1 } Unit Weight (ASTM C138) Concrete Placed: (see page 1 } COMPRESSIVE STRENGTH TESTS (ASTM C31, C39) _(Standard 4" x 8" or 6" x 12" cylinder Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 101 5.25 7 9/1212014 102 5.25 7 9/12/2014 103 5.25 28 1013!2014 104 5.25 28 10/3/2014 105 5.50 7 9/12/2014 106 5.50 7 9/12/2014 107 5.50 28 10/3/2014 108 5.50 28 10/3/2014 52,800 4200 52,300 4160 28 -Day Average 3600 46,400 3690 47;200 3760 28 -Day Average 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RL! REMARKS: 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-8419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX LOCATION OF POUR: SET 1: Paving: Saratoga Way @ Station 2+60 JOB NO.: 14.1433 DATE: 15 August 2014 WEATHER: Clear, 74-98°F SET 2: Paving: Saratoga Way @ Station 1+50 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 4862 4884 Mix No.: 8274SF Ticket No. 2401915 2402064 Plant No.: 131,128 Time Batched 6:11 AM 6:53 AM Time Sampled 5:50 AM 7:26 AM Time Start: 8:00 AM Concrete Temp. (ASTM C1064) 91'F 89°F Air Content (ASTM C231) 4.4% 4.3% Time Finished: 12:30 PM Unit Weight (ASTM C1 38) Concrete Placed: 620 cy COMPRESSIVE STRENGTH TESTS ASTM C31, C39) Standard 4" x 8" or 6" x 12" c linden Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day ASTM C143 SI Stren th 33 4.75 7 8/22/2014 61,100 4860 34 4.75 7 8/22/2014 56,400 4490 35 4.75 28 9/1212014 68,500 5450 36 4.75 28 9/12/2014 68,400 5440 28 -Day Average 5450 3$00 37 4.00 7 8/22/2014 53,800 4280 38 4.00 7 8/22/2014 53,100 4230 39 4.00 28 9112/2014 59,600 4740 40 4.00 28 9/12/2014 57,800 4600 28 -Day Average 4670 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper "testing Laboratories, Inc, Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX LOCATION OF POUR: JOB NO.: 14.1033 ❑ATE: 15 August 2014 WEATHER: Clear, 74-98°F SET 1: Paving: Saratoga Way L7a Station 0+57 SET 2: Paving: Prescott Lane @ Station 4+70 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 3854 4862 Mix No.: 8274SF Ticket No. 2402267 2402495 Plant No.; (see page 1 ) Time Batched 7:30 AM 8:22 AM Time Sampled 7:58 AM 8:56 AM Time Start: (See page 1) Concrete Temp. (ASTM Ciorw 89'F 91"F Air Content (ASTM 0231) 4.4% 4.3% Time Finished: (see page 1) Unit Weight (ASTM C138) Concrete Placed: (see page 1) COMPRESSIVE STRENGTH TESTS ASTM C31, C39 Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143psi Strength 41 4.00 7 8/2212014 53,400 4250 42 4.00 7 8/22/2014 56,200 4470 43 4.00 28 9/12/2014 66,600 5300 44 4.00 28 911212014 66,000 5250 28 -Day Average 5280 3600 45 4.00 7 8122/2014 57,100 4540 45 4.00 7 8/22/2014 60,400 4810 47 4.00 28 9/1212014 68,800 5480 48 4.00 28 9/12/2014 70,700 5630 28 -Day Average 5560 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 14.1033 CLIENT: Pavecon Public Works, LP DATE: 15 August 2014 PROJECT: Belmont Landing WEATHER: Clear, 74-98°F Coppell, TX LOCATION OF POUR: SET 1: Paving: Prescott Lane @ Station 3+60 SET 2: Paving: Prescott Lane @ Station 2+25 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 6006 6018 Mix No.: 8274SF Ticket No. 2402657 2402872 Plant No.: (see page 1) Time Batched 8:50 AM 9:43 AM Time Sampled 9:41 AM 10:16 AM Time Start: (see page 1) Concrete Temp. (ASTMC1064) 88"F 91 OF Air Content (ASTM C231) 4.0% 4.4% Time Finished: (see page 1 ) Unit Weight (ASTM C138) Concrete Placed: (see page 1) COMPRESSIVE STRENGTH TESTSA( STM C31, C39) (Standard 4" x 8" or 6" x 12" c linder Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) sl Strength 49 4.50 7 8/22/2014 52,900 4210 50 4.50 7 8/22/2014 52,000 4140 51 4.50 28 9/12/2014 58,000 4620 52 4.50 28 911212014 59,000 4700 28 -Day Average 4664 3600 53 3.75 7 8/2212014 57,300 4560 54 3.75 7 8/22/2014 56,400 4490 55 3.75 28 9/1212014 68,400 5440 56 3.75 28 9/1212014 68,500 5450 28 -Day Average 5450 3600 TECHNICIAN: SET 1 - RL.I SET 2 - Rl..] REMARKS: 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX LOCATION OF POUR: SET 1: Paving: Prescott Lane @ Station 1+05 SET 2: SAMPLE DATA: SET 1 SET 2 Truck No. 6006 Ticket No. 2403031 Time Batched 10:24 AM Time Sampled 11:27 AM Concrete Temp. (ASTM 01064) 93"F Air Content (ASTM 0231) 4.2% Unit Weight (ASTM C138) Strength JOB NO.: 14.1033 DATE: 15 August 2014 WEATHER: Clear, 74-98°F SUPPLIER: TXI Mix No.: 8274SF Plant No.: (see page 1) Time Start: (see page 1) Time Finished: (see page 1) Concrete Placed: (see page 1) COMPRESSIVE STRENGTH TESTS ASTM C31 Cas Standard 4" x 8" or 6" x 12" cylinder Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day ASTM C143psi Strength 57 3.75 7 8/22/2014 52,300 4240 58 3.75 7 8/22/2014 49,600 3950 59 3.75 28 9/12/2014 57,100 4540 60 3.75 28 9/12/2014 62,300 4960 28 -Day Average 4750 3600 TECHNICIAN: SET 1 - RLJ SET 2 - REMARKS: 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-8419 Fax (214) 351-5148