Loading...
Belmont-LR140814Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX JOB NO.: 14.1033 DATE: 14 August 2014 WEATHER: Clear, 73-97°F LOCATION OF POUR: Paving: Preakness Lane, Station 5+84 to Station 0+48; Saratoga Way, Station 8+36 to Station 4+25 SET 1: Paving: Preakness Lane @ Station 5+84 SET 2: Paving: Preakness Lane @ Station 4+85 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 4231 4866 Mix No.: 8274SF Ticket No. 2399320 2399547 Plant No.: 140, 131, 128, 141 Time Batched 5:39 AM 5:56 AM Time Sampled 6:23 AM 7:24 AM Time Start: 5:00 AM Concrete Temp. (ASTM C1064) 89°F 90°F Air Content (ASTM C231) 4.1% 4.3% Time Finished: 2:34 PM Unit Weight (ASTM C138) Concrete Placed: 800 Cy COMPRESSIVE STRENGTH TESTS (ASTM C31, C39) (Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age "Gest Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day ASTM C143psi Strength 1 3.00 7 8/21/2014 53,100 4230 2 3.00 7 8/21/2014 55,300 4400 3 3.00 28 9/11/2014 65,300 5200 4 3.00 28 9111/2014 66,900 5320 28 -Day Average 5250 3600 5 3.00 7 8121/2014 58,600 4660 6 3.00 7 8/21/2014 60,900 4850 7 3.00 28 911112014 66,800 5320 8 3.00 28 9/11/2014 69,900 5550 28 -Day Average 5440 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX JOB NO.: 14.1033 DATE: 14 August 2014 WEATHER: Clear, 73-97°F LOCATION OF POUR: Paving: Preakness Lane, Station 5+84 to Station 0+48; Saratoga Way, Station 8+36 to Station 4+25 SET 1: Paving: Preakness Lane @ Station 3+52 SET 2: Paving: Preakness Lane @ Station 1+90 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 3224 6006 Ticket No, 2399731 2400033 Time Batched 7:30 AM 8:51 AM Time Sampled 8:12 AM 9:30 AM Concrete Temp. (ASTM C1064) 92°F 92°F Air Content (ASTM 0231) 4.3% 4.5% Unit Weight (ASTM C138) Mix No_: 8274SF Plant No.: 140, 131, 128, 141 Time Start: (see page 1 } Time Finished: (see page ! } Concrete Placed: {see page 1 } COMPRESSIVE STRENGTH TESTS ASTM C31, C39 Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day ASTM 0143psi Strength 9 2.75 7 8/21/2014 54,600 4350 10 2.75 7 8121/2014 55,300 4400 11 2.75 28 9/11/2014 65,700 5230 12 2.75 28 9/11/2014 66,300 5280 28 -Day Average 5260 3548 13 3.50 7 8/21/2014 14 3.50 7 8/21/2094 15 3.50 28 9/11/2014 16 3.50 28 9/11/2014 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: 54,000 4300 57,000 4540 69,300 5520 64,700 5150 28 -Day Average 5340 3604 2870 Walnut HIII Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX JOB NO.: 14.1033 DATE: 14 August 2014 WEATHER: Clear, 73-97°F LOCATION OF POUR: Paving: Preakness Lane, Station 5+84 to Station 0+48; Saratoga Way, Station 8+36 to Station 4+25 SET 1: Paving: Saratoga Way @ Station 8+05 SET 2: Paving: Saratoga Way @ Station 6+50 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 4851 3224 Ticket No. 2400225 2400395 Time Batched 10:02 AM 10:48 AM Time Sampled 10:48 AM 11:29 AM Concrete Temp. [ASTM C1064y 92'F 91 °F Air Content (ASTM C231) 3.6% 3.5% Unit Weight (ASTM C138) (ASTM C143psi Mix No.: 8274SF Plant No.: 140, 131, 128, 141 Time start: (See page 1) Time Finished: (see page 1) Concrete Placed: (see page 1) COMPRESSIVE VRENGTN TESTS ASTM C31, G38 Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143psi Strength 17 4.25 7 8/21/2014 56,700 4510 18 4.25 7 812112014 58,160 4620 19 4.25 28 9/11/2014 68,300 5440 20 4.25 28 9/11/2014 65,700 5230 28 -Day Average 5340 3600 21 4.50 7 8/21/2014 55,500 4420 22 4.50 7 8/21/2014 59,900 4770 23 4.50 28 9/11/2014 67,500 5370 24 4.50 28 9/11/2014 67,800 5400 28 -Day Average 5390 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-8419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 14.1033 CLIENT: Pavecon Public Works, LP DATE: 14 August 2014 PROJECT: Belmont Landing WEATHER: Clear. 73-97°F Coppeil, TX LOCATION OF POUR: Paving: Preakness Lane, Station 5+84 to Station 0+48; Saratoga Way, Station 8+36 to Station 4+25 SET 1: Paving: Saratoga Way @ Station 5+82 SET 2: Paving: Saratoga Way @ Station 4+80 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 4.25 3242 3850 Mix No.: 8274SF 26 Ticket No. 7 2400621 2400836 Plant No.: 140, 131, 128, 141 4.25 Time Batched 9/11/2014 11:16 AM 12:27 PM 28 4.25 28 Time Sampled 59,600 12:08 PM 12:57 PM Time Start: (see page 1 ) Concrete Temp. (ASTM C1064) 95°F 95°F 7 8/21/2014 52,100 Air Content (ASTM C231) 4,4% 4.3% Time Finished: (see page 1) 4060 Unit Weight (ASTM C138) 28 9/11/2014 56,100 4460 32 4.50 28 9/1112014 55,000 Concrete Placed: (see page 1 } COMPRESSIVE STRENGTH TESTS ASTM C31. C39) (Standard 4" x 8" or B" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 25 4.25 7 8/2112014 55,700 4430 26 4.25 7 8121/2014 53,400 4250 27 4.25 28 9/11/2014 59,380 4720 28 4.25 28 9111/2014 59,600 4740 28 -Day Average 4730 3600 29 4.50 7 8/21/2014 52,100 4150 30 4.50 7 8/2112014 51,000 4060 31 4.50 28 9/11/2014 56,100 4460 32 4.50 28 9/1112014 55,000 4380 28 -Day Average 4420 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5143