Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Belmont-LR140815
Hooper Testing Laboratories, inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX LOCATION OF POUR: JOB NO.: 14.1033 DATE: 15 August 2014 WEATHER: Clear, 74-98°F SET 1: Paving: Saratoga Way @ Station 2+60 SET 2: Paving: Saratoga Way @ Station 1+50 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 4862 4884 Mix No.: 8274SF Ticket No. 2401915 2402064 Plant ND.: 131,128 Time Batched 6:11 AM 6:53 AM Time Sampled 6:50 AM 7:26 AM Time Start: 6:00 AM Concrete Temp. (ASTM C1064) 91 °F 890F Air Content (ASTM 0231) 4.4% 4.3% Time Finished: 12:30 PM Unit Weight (ASTM C1 38) Concrete Placed: 620 Cy COMPRESSIVE STRENGTH TESTS ASTM C31, G39 Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day -ASTM C143psi Strength 33 4.75 7 8/22/2014 61,100 4660 34 4.75 7 8122/2014 56,400 4490 35 4.75 28 9/12/2014 36 4.75 28 9/12/2014 28 -Day Average 3600 37 4.00 7 812212.014 53,800 4280 38 4.00 7 8/22/2014 53,100 4230 39 4.00 28 9/12/2014 40 4.00 28 9112/2014 28 -Day Average 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ so's REMARKS: /;/;*� 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax [214] 351-5148 Hooper Testing Laboratories, inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX LOCATION OF POUR: SET 1: Paving: Saratoga Way @ Station 0+57 SET 2: Paving: Prescott Lane @ Station 4+70 SAMPLE DATA: SET 1 SET 2 JOB NO.: 14.1033 DATE: 15 August 2014 WEATHER: Clear, 74-98OF SUPPLIER: TXI Truck No. 3854 4862 Mix No.: 8274SF Ticket No. 2402257 2402495 Plant No.: (see page 1) Time Batched 7:30 AM 8:22 AM Time Sampled 7:58 AM 8:56 AM Time Start: (see page 1) Concrete Temp. {ASTM 01064} 89°F 91 OF Air Content (ASTM C231) 4.4% 4.3% Time Finished: (see page 1) Unit Weight (ASTM C138) Concrete Placed: (see page 1) COMPRESSIVE STRENGTH TESTS ASTM C31, C39 Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days [late Pounds Strength 28 -Day ASTM C143psi Strength 41 4.00 7 8/22/2014 53,400 4250 42 4.00 7 8/22/2014 56,200 4470 43 4.00 28 9/12/2414 44 4.00 28 9/12/2014 28 -Day Average 3600 45 4.00 7 8122/2014 57,100 4540 46 4.00 7 8/22/2014 60,400 4810 47 4.00 28 9/1212014 48 4.00 28 9/12/2014 28 -Day Average 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: 2870 Walnut HIII Lane Gallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc, Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX LOCATION OF POUR: JOB NO.: 14.1033 DATE: 15 August 2014 WEATHER: Clear, 74-98°F SET 1: Paving: Prescott Lane @ Station 3+60 SET 2: Paving: Prescott Lane @ Station 2*25 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 3.75 6496 6918 Mix No.: 8274SF Ticket No. 8/22/2014 2402657 2402872 Plant No.: (see page 1) Time Batched 3.75 8:50 AM 9:43 AM Time Sampled 9:41 AM 10:16 AM Time Start: (see page 1) Concrete Temp. (ASTM C1ofi4) 88°F 91'F Air Content (ASTM 0231) 4.0% 4.4% Time Finished: (see page 1) Unit Weight (ASTM 0138) Concrete Placed: (see page 1) COMPRESSIVE STRENGTH TESTS ASTM C31 C39 Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 49 4.50 7 8/22/2014 52,900 4210 50 4.50 7 8/22/2014 52,000 4140 51 4.50 28 9/12/2014 52 4.50 28 911212014 53 3.75 7 8/22/2014 54 3.75 7 8/22/2014 55 3.75 28 9/12/2414 56 3.75 28 9112/2914 TECHNICIAN: SET 1 - RL.i SET 2 - RL.! REMARKS: 28 -Day Average 3600 57,300 4560 56,400 4499 28 -Day Average 3600 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX LOCATION OF POUR: SET 1: Paving: Prescott Lane @ Station 1+05 SET 2: SAMPLE DATA: SET 7 Truck No. 5046 Ticket No. 2403031 Time Batched 10:24 AM Time Sampled 11:27 AM Concrete Temp. (ASTM G10rA) 930F Air Content (ASTM C231) 4.2% Unit Weight (ASTM C1 38) Days JOB NO.: 14.1033 DATE: 15 August 2414 WEATHER: Clear, 74-98°F SET 2 SUPPLIER: TXI Mix No.: 8274SF Plant No.: (see page 1) Time Start: (see page 1) Time Finished: (see page 1) Concrete Placed: (See page 1) COMPRESSIVE STRENGTH TESTS ASTM C31, C39 Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -bay ASTM G143psi Strength 57 3.75 7 8/22/2014 52.300 4240 .58 3.75 7 8/22/2014 49,600 3950 59 3.75 28 9/12/2014 50 3.75 28 9/12/2014 28 -Day Average 3600 TECHNICIAN: SET 1 - Rt_,! SET 2 - REMARKS: 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148