Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Belmont-LR140814 (2)
Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavecon Public Works, LP PROJECT: Belmont Landing Coppell, TX JOB NO.: 14.1033 DATE: 14 August 2+014 WEATHER: Clear, 73-97°F LOCATION OF POUR: Paving: Preakness Lane, Station 5+84 to Station 0+48; Saratoga Way, Station 8+36 to Station 4+25 SET 1: Paving: Preakness Lane @ Station 5+84 SET 2: Paving: Preakness Lane @ Station 4+85 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 4231 4866 Mix No.: 8274SF Ticket No. 2399320 2399547 Plant No.: 140, 131, 128, 141 Time Batched 5:39 AM 6:56 AM Time Sampled 6:23 AM 7:24 AM Time Start: 5:00 AM Concrete Temp. (ASTM C1064) 89°F 90°F Air Content (ASTM 0231) 4.1% 4.3% Time Finished. 2:30 PM Unit Weight (ASTM C138) Concrete Placed: 800 cy COMPRESSIVE STRENGTH 'TESTS ASTM C31 Gast {Standard 4" x 8" or _6"_x 12" cylinder} Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day ASTM C143)_psi Strength 1 3.00 7 8/21/2014 53,100 4230 2 3.00 7 8/21/2014 55,300 4400 3 3.00 28 9/11/2014 4 3.00 28 9/11/2014 28 -Day Average 3600 5 3.00 7 8/2112014 58,600 4660 6 3.00 7 8/21/2014 60,900 4850 7 3.00 28 9/11/2014 8 3.00 28 9/11/2014 28 -Day Average 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 14.1033 CLIENT: Pavecon Public Works, LP DATE: 14 August 2014 PROJECT: Belmont Landing WEATHER: Clear, 73-97°F Coppell, TX LOCATION OF POUR: Paving: Preakness Lane, Station 5+84 to Station 0+48; Saratoga Way, Station 8+36 to Station 4+25 SET 1: Paving: Preakness Lane @ Station 3+52 SET 2: Paving: Preakness Lane @ Station 1+90 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 3224 6006 Mix No.: 8274SF Ticket No. 2399731 2400033 Plant No.: 140, 131, 128, 141 Time Batched 7:30 AM 8:51 AM Time Sampled 8:12 AM 9:30 AM Time Start: (see page 1) Concrete Temp. (ASTM =64) 927 920F Air Content (ASTM 0231) 4.3% 4.5% Time Finished: (see page 1) Unit Weight (ASTM C138) Concrete Placed; (see page 1) COMPRESSIVE STRENGTH TESTS ASTM C31, Cas Standard 4" x 8" or 6" x 12" cylinder Cylinder Slump Age Test Total Load Compressive _ Required Number Inches Days Date Pounds Strength 28 -Day ASTM C143 psi Strength 9 2.75 7 8121/2414 54,600 4350 10 2.75 7 8/2112014 55,300 4400 11 2.75 28 9/11/2014 12 2.75 28 9/11/2014 28 -Day Average 3600 13 3.50 7 8121/2014 54.000 4300 14 3.50 7 8121/2014 57,000 4540 15 3.50 28 9/1112014 16 3.50 28 9/11/2414 28 -Day Average 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Paveccn Public Works, LP PROJECT: Belmont Landing Coppell, TX JOB NO.: 14.1033 DATE: 14 August 2014 WEATHER: Clear, 73-97'F LOCATION OF POUR: Paving: Preakness Lane, Station 5+84 to Station 0+48; Saratoga Way, Station 8+36 to Station 4+25 SET 1: Paving: Saratoga Way @ Station 8+05 SET 2: Paving: Saratoga Way @ Station 6+50 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TXI Truck No. 4.50 4851 3224 Mix No.: 8274SF Ticket No. 8/21/2014 2400225 2400395 Plant No.: 140, 131, 128, 141 Time Batched 4.50 10:02 AM 10:48 AM Time Sampled 10:48 AM 11:29 AM Time Start: (see page 1) Concrete Temp. (ASTM C1 064) 92°F 91 °F Air Content (ASTM 0231) 3.6% 3.5% Time Finished: (see page 1) Unit Weight (ASTM 0138) Concrete Placed: (see page 1) COMPRESSIVE STRENGTH TESTS fASTM C34 C39 Standard 4" x 8" or 6" x 12" C linder Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day ASTM C143psi Strength 17 4.25 7 8/21/2014 56,700 4510 18 4.25 7 8/21/2014 58_.100 4620 19 4.25 28 9/11/2014 20 4.25 28 9111/2014 21 4.50 7 8/21/2014 22 4.50 7 8/21/2014 23 4.50 28 9/11/2014 24 4.50 28 9/11/2014 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: 28 -Day Average 55,500 4420 59,900 4770 28 -Day Average 3500 3500 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Testing Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 14.1433 CLIENT: Pavecon Public Works, LP DATE: 14 August 2014 PROJECT: Belmont Landing WEATHER: Clear, 73-97°F Coppell, TX LOCATION OF POUR: Paving: Preakness Lane, Station 5+84 to Station 0+48; Saratoga Way, Station 8+36 to Station 4+25 SET 1: Paving: Saratoga Way @ Station 5+82 7 8121/2014 SET 2: Paving: Saratoga Way @ Station 4+80 7 8/21/2014 SAMPLE DATA: SET 1 SET 2 SUPPLIER: TKI Truck No. 28 3242 3850 Mix No.. 8274SF Ticket No. 2400621 2400836 Plant No.: 140, 131, 128: 141 Time Batched 11:16 AM 12:27 PM Time Sampled 12:08 PM 12:57 PM Time Start: (see page 1) Concrete Temp. [ASTM C1064] 95°F 950F Air Content (ASTM C231) 4.4% 4.3% Time Finished: (see page 1) Unit Weight (ASTM G1 38) Concrete Placed: (see page 1) COMPRESSIVE STRENGTH TESTS (ASTM_ C31. C39) (Standard 4" x 8" or 6" x 12" cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day ASTM 0143psi Strength 25 4.25 7 8/21/2014 55,700 4430 26 4.25 7 8/21/2014 53,400 4250 27 4.25 28 9/11/2014 28 4.25 28 9/11/2014 29 4.50 7 8121/2014 30 4.50 7 8/21/2014 31 4.50 28 9/11/2014 32 4.50 28 9/11/2014 28 -Day Average 3600 52,100 4150 51,000 4060 28 -Day Average 3600 TECHNICIAN: SET 1 - RLJ SET 2 - RLJ REMARKS: 2870 Walnut Hili Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148