ST9302-LR010529 (2) ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
972/620-8911- 972/263-4937 (Metro) DALLY FIELD REPORT
FAX: 972/406-8023
TESTED FOR: CITY OF COPPELL DATE: 05/29101
COPPELL, TEXAS
PROJECT: SANDY LAKE ROAD PROJ. NO. ST93 OUR REPORT NO: 98881-203
COPPELL, TEXAS
TECHNICIAN: D.H.
WEATHER: CLEAR TEMPERATURE RANGE: 75 TO 80
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING
WORK AND PERFORM FIELD TESTING AS REQUESTED.
A TOTAL OF 3 FIELD DENSITY TESTS WERE PERFORMED ON STABILIZED SOIL FOR PAVING AREA. SEE
ATTACHED REPORT FOR RESULTS OF FIELD COMPACTION TESTING.
WHILE ON SITE THE TECHNICIAN PERFORMED 4 FIELD GRADATION TEST ON LIME STABILIZED MATERIALS.
SEE ATTACHED REPORT FOR TEST RESULTS.
GARY WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS.
AT THE COMPLETION OF THE SCHEDULED WORK, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.
CC:
ED BELL CONSTRUCTION
Our test results and . . ) an.d ~hall n?t be rep! c~l~d'
reports are for the exclusive use of the client (and their designated recipients on file in our office) and all not be repredu nd/or distributed except with express approval of
ALPHA. The use of our name and test results must receive our wtritten approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of
apparently identical or similar specimens.
Geotechnical Engineering · Construction Matorials Tosting · Environmental Engineering · Consulting