Loading...
ST9302-LR010529 (2) ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911- 972/263-4937 (Metro) DALLY FIELD REPORT FAX: 972/406-8023 TESTED FOR: CITY OF COPPELL DATE: 05/29101 COPPELL, TEXAS PROJECT: SANDY LAKE ROAD PROJ. NO. ST93 OUR REPORT NO: 98881-203 COPPELL, TEXAS TECHNICIAN: D.H. WEATHER: CLEAR TEMPERATURE RANGE: 75 TO 80 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. A TOTAL OF 3 FIELD DENSITY TESTS WERE PERFORMED ON STABILIZED SOIL FOR PAVING AREA. SEE ATTACHED REPORT FOR RESULTS OF FIELD COMPACTION TESTING. WHILE ON SITE THE TECHNICIAN PERFORMED 4 FIELD GRADATION TEST ON LIME STABILIZED MATERIALS. SEE ATTACHED REPORT FOR TEST RESULTS. GARY WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. AT THE COMPLETION OF THE SCHEDULED WORK, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CC: ED BELL CONSTRUCTION Our test results and . . ) an.d ~hall n?t be rep! c~l~d' reports are for the exclusive use of the client (and their designated recipients on file in our office) and all not be repredu nd/or distributed except with express approval of ALPHA. The use of our name and test results must receive our wtritten approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Geotechnical Engineering · Construction Matorials Tosting · Environmental Engineering · Consulting