Loading...
Westhaven 2-LR141001TESTED FOR:DATE: PROJECT:OUR REPORT NO.: TECHNICIAN: M. Howlander WEATHER:Sunny TEMPERATURE RANGE : Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of Alpha. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. 10/01/14 REPORT Respectfully Submitted, The Alpha technician traveled to the above referenced site to monitor ongoing work and perform field testing as requested. Upon arrival at the site, the technician was informed that previously scheduled concrete pour for sidewalk was cancelled as contractor was not ready. DAILY FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 130127-170Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas Standard Pacific Homes - Irving Irving, Texas