Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Westhaven 2-LR140821 (2)
Concrete Compression Test Report 2209 Wisconsin St., Suite 100 Dallas, TX 75229 (972)620-8911 Alpha Testing, Inc. TBPE Firm No. 813 FIELD DATA Placement Location:PIERS ON PEDESTRIAN BRIDGE PB1: SW BP-PB1, NW BP-PB1 Project Desc:WESTHAVEN PHASE 1 & 2 - MASS GRADING OFF STATE HWY 121 AND WESTHAVEN RD. Our Report #:130127-159 STANDARD PACIFIC HOMES - IRVING 909 LAKE CAROLYN PARKWAY #1700 IRVING, TX 75039 CHIP BOYDATTN: (972) 550-7891Fax Number: Date Placed:7/24/2014 Time Placed:1:45 PM 5.0 3.5 98 99 Date Received:7/25/2014 Concrete Supplier:LMC Submitted By:Chapagain, Rajendra Plant Number:956 Delivery Ticket No.:63083589 N/A Batch Time:12:30:00 PM Tested For: Lab No.: Cure Type: Date Tested: Age (Days): Max Load: Area: Sq. In.PSI: Cap Spec: CYLINDER COMPRESSION TEST RESULTS (ASTM C-231) Avg. Length Avg. Width Avg Depth/ Diameter Cast By:ALPHA Cured Specification:ASTM C-31 Mix ID:5409 Break Type: Sample Location:PIER: SW BP-PB1 PM:ATTEF ABUSHAKRA, P.E. Date Issued:08/21/2014 Specified Strength:4000 Result Air Content: Ambient Temp (F): Concrete Temp (F): Unit Weight: Slump (ASTM C-143): 57 7/31/2014 7 4618012.56 3680LABC-1231 8 N/A 42 58 8/21/2014 28 5914012.56 4710LABC-1231 8 N/A 42 59 8/21/2014 28 5658012.56 4500LABC-617 8 N/A 42 60 8/21/2014 28 5712012.56 4550LABC-617 8 N/A 43 Average 28-day Compressive Strength is compliant with project specifications CC:City of Coppell 4590 Respectfully Submitted By:__________________________________________________________ of Alpha Testing, Inc. Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 180829 Break Types: 1: Cone 2: Cone and Split 3: Cone and Shear 4: Shear 5: Columnar * = Specification out of spec Test Method: Unless noted, concrete was sampled and tested in accordance with ASTM C172, C143, C231, C173, C1064, C31, C1231 and C138. Compression strength tests per ASTM C39.