Loading...
Westhaven 2-LR140728TESTED FOR:Standard Pacific Homes - Irving DATE: Irving, Texas PROJECT:Westhaven Phase 1 & 2 - Mass Grading OUR REPORT NO.: 130127-162 Coppell, Texas TECHNICIAN: PIER DRILLING CO.:N. L. Schutte Foundation Drilling, Inc.PAGE: PIER IDENTIFICATION NEBP-PB1 NEAP-PB1 24.0 18.0 461.8 461.8 457.8 457.8 28.0 28.0 37.0 37.0 9.0 9.0 9.0 9.3 33.0 33.8 Wet Dry 26.0 20.0 32.4 33.0 8 6 7 6 32.4 34.3 12:15 PM 1:45 PM 7:30 PM 6:50 PM REMARKS:Concrete was delayed by 4.25 hours per schedule.Respectfully Submitted, Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. 1 OF 1 LENGTH OF VERTICAL BARS (FT.) TIME DRILLING WAS COMPLETED TIME CONCRETE WAS PLACED REQUIRED PENETRATION (FT.) DEPTH TO BEARING STRATUM FROM GROUND (FT.) DEPTH OF PIER FROM GROUND (FT.) ACTUAL PENETRATION (FT.) CASING DIAMETER (IN.) REINFORCING BAR SIZE (#) 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 07/28/14 NUM. OF VERTICAL BARS (EA.) TOP OF PIER ELEVATION (FT.) CASED DEPTH (FT.) DEPTH FROM TOP OF CONCRETE (FT.) R. Chapagain REPORT OF DRILLED STRAIGHT SHAFT PIERS TOP OF GROUND ELEVATION (FT.) PIER DIAMETER (IN.) CONDITION OF BOTTOM (WET OR DRY)