Loading...
Westhaven 2-LR140725TESTED FOR:Standard Pacific Homes - Irving DATE: Irving, Texas PROJECT:Westhaven Phase 1 & 2 - Mass Grading OUR REPORT NO.: 130127-158 Coppell, Texas TECHNICIAN: PIER DRILLING CO.:N.L. Schutte Foundation Drilling, Inc.PAGE: PIER IDENTIFICATION SW-APPB1 NW-APPB1 18.0 18.0 460.0 460.0 457.8 457.8 27.0 27.0 31.0 32.5 9.0 9.0 4.0 5.5 28.8 30.3 WET WET 20.0 20.0 29.0 31.0 6 6 6 6 36.0 36.0 2:15 PM 1:30 PM 3:30 PM 3:15 PM REMARKS:Penetration was confirmed per project manager's conversation with Structural Engineer.Respectfully Submitted, Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. TOP OF GROUND ELEVATION (FT.) PIER DIAMETER (IN.) CONDITION OF BOTTOM (WET OR DRY) REINFORCING BAR SIZE (#) 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 07/25/14 NUM. OF VERTICAL BARS (EA.) TOP OF PIER ELEVATION (FT.) 120 ft Steel Truss Span Pedistrian Bridge CASED DEPTH (FT.) DEPTH FROM TOP OF CONCRETE (FT.) R. Chapagain REPORT OF DRILLED STRAIGHT SHAFT PIERS 1 OF 1 LENGTH OF VERTICAL BARS (FT.) TIME DRILLING WAS COMPLETED TIME CONCRETE WAS PLACED REQUIRED PENETRATION (FT.) DEPTH TO BEARING STRATUM FROM GROUND (FT.) DEPTH OF PIER FROM GROUND (FT.) ACTUAL PENETRATION (FT.) CASING DIAMETER (IN.)