Westhaven 2-LR140619 (2)TESTED FOR:DATE:
PROJECT:OUR REPORT NO.:
TECHNICIAN: C. Pugh
WEATHER:Cloudy TEMPERATURE RANGE :
Attef Abushakra, P.E.
ALPHA TESTING, INC.
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of Alpha. The use of our name and
test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
DAILY FIELD
2209 Wisconsin Street, Suite 100
Dallas, Texas 75229
Geotechnical I Construction Materials I Environmental
www.alphatesting.com
TBPE Firm No. 813
130127-148
90 Degrees
Westhaven Phase 1 & 2 - Mass Grading
Coppell, Texas
Standard Pacific Homes - Irving
Irving, Texas
Respectfully Submitted,
The Alpha technician traveled to the above referenced site to monitor ongoing work and perform field testing as requested.
The technician was informed that previously scheduled concrete pour for wall pier for paving was cancelled as contractor was
not ready.
06/19/14
REPORT