Loading...
Westhaven 2-LR140523 (2)TESTED FOR:Standard Pacific Homes - Irving DATE: Irving, Texas PROJECT:Westhaven Phase 1 & 2 - Mass Grading OUR REPORT NO.: 130127-141 Coppell, Texas TECHNICIAN: PIER DRILLING CO.:Agreda's Drilling Construction PAGE: PIER IDENTIFICATION SBP/PB2 NBP/PB2 SAB/PB2 NAB/PB2 24.0 24.0 18.0 18.0 454.3 454.3 454.3 454.3 450.8 450.8 450.8 450.8 13.0 12.5 13.0 13.0 20.3 20.5 20.0 21.0 7.0 7.0 7.0 7.0 7.3 8.0 7.0 8.0 16.8 17.0 16.5 17.5 DRY DRY DRY DRY N/A N/A N/A N/A N/A N/A N/A N/A 8 8 6 6 7 7 6 6 20.3 20.3 19.5 21.3 9:45 AM 11:35 AM 12:50 PM 1:35 PM 3:45 PM 3:55 PM 3:35 PM 4:05 PM REMARKS:Respectfully Submitted, Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. 1 OF 1 LENGTH OF VERTICAL BARS (FT.) TIME DRILLING WAS COMPLETED TIME CONCRETE WAS PLACED REQUIRED PENETRATION (FT.) DEPTH TO BEARING STRATUM FROM GROUND (FT.) DEPTH OF PIER FROM GROUND (FT.) ACTUAL PENETRATION (FT.) CASING DIAMETER (IN.) 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 05/23/14 NUM. OF VERTICAL BARS (EA.) TOP OF PIER ELEVATION (FT.) CASED DEPTH (FT.) DEPTH FROM TOP OF CONCRETE (FT.) R. Chapagain REPORT OF DRILLED STRAIGHT SHAFT PIERS TOP OF GROUND ELEVATION (FT.) PIER DIAMETER (IN.) CONDITION OF BOTTOM (WET OR DRY) NAB/PB2: North abuttment pier/ Drawing PB 2.1 & 2.2 REINFORCING BAR SIZE (#) East End of 50 ft Bridge SBP/PB2; South bridge Pier/ Drawing PB 2.1 & 2.2 NBP/PB2: North bridge pier/ Drawings PB 2.1 & 2.2 SAB/PB2: South abuttment pier/ Drawing PB 2.1 & 2.2