Loading...
Westhaven 2-LR130624 (2)TESTED FOR:DATE: 06/24/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 2399 06/24/13 FG-6.0 1 11.9 117.9 13.5 117 99 1-A 2400 06/24/13 FG-5.0 1 11.9 117.9 14.0 116 99 1-A 2401 06/24/13 FG-4.0 1 11.9 117.9 14.1 115 98 1-A 2402 06/24/13 FG-3.0 2 9.2 124.4 12.8 119 95 1-A 2403 06/24/13 FG-2.0 2 9.2 124.4 12.7 119 95 1-A 2404 06/24/13 FG-1.0 2 9.2 124.4 13.0 120 96 1-A 2405 06/24/13 FG 2 9.2 124.4 12.9 118 95 1-A TEST LOCATION:Phase I 2399 2400 2401 2402 2403 2404 2405 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: SOIL ID NUMBER COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Storm Sewer Line A at Station 2+70 Storm Sewer Line A at Station 2+52 Storm Sewer Line A at Station 2+55 Storm Sewer Line A at Station 2+60 Storm Sewer Line A at Station 2+58 Irving, Texas Storm Sewer Line A at Station 2+65 TEST NO. Storm Sewer Line A at Station 2+50 Don Hinton 130127-120 DATE IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving TESTED FOR:DATE: 06/24/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 2406 06/24/13 FG-6.0 1 11.9 117.9 15.9 113 95 1-A 2407 06/24/13 FG-5.0 1 11.9 117.9 13.7 116 98 1-A 2408 06/24/13 FG-4.0 1 11.9 117.9 14.9 115 98 1-A 2409 06/24/13 FG-3.0 1 11.9 117.9 13.9 116 99 1-A 2410 06/24/13 FG-2.0 1 11.9 117.9 15.3 114 97 1-A 2411 06/24/13 FG-1.0 1 11.9 117.9 15.9 113 95 1-A 2412 06/24/13 FG 1 11.9 117.9 15.0 113 96 1-A TEST LOCATION:Phase I 2406 2407 2408 2409 2410 2411 2412 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. TECHNICIAN: Don Hinton REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Standard Pacific Homes - Irving Irving, Texas Westhaven Phase 1 & 2 - Mass Grading 130127-120A Coppell, Texas Storm Sewer Line A at Station 4+52 Storm Sewer Line A at Station 4+55 TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Storm Sewer Line A at Station 4+50 Storm Sewer Line A at Station 4+58 Storm Sewer Line A at Station 4+60 Storm Sewer Line A at Station 4+62 Storm Sewer Line A at Station 4+65 TESTED FOR:DATE: 06/24/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 2413 06/24/13 FG-3.0 2 9.2 124.4 11.6 120 97 1-A 2414 06/24/13 FG-2.0 2 9.2 124.4 10.7 122 98 1-A 2415 06/24/13 FG-1.0 2 9.2 124.4 11.3 121 97 1-A 2416 06/24/13 FG 2 9.2 124.4 10.6 119 96 1-A 2417 06/24/13 FG-2.0 2 9.2 124.4 10.9 125 100 1-A 2418 06/24/13 FG-1.0 2 9.2 124.4 11.9 121 98 1-A 2419 06/24/13 FG 2 9.2 124.4 10.8 120 96 1-A TEST LOCATION:Phase I 2413 2414 2415 2416 2417 2418 2419 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. TECHNICIAN: Don Hinton REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Standard Pacific Homes - Irving Irving, Texas Westhaven Phase 1 & 2 - Mass Grading 130127-120B Coppell, Texas Storm Sewer Line A at Station 6+22 Storm Sewer Line A at Station 6+25 TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Storm Sewer Line A at Station 6+20 Storm Sewer Line A at Station 6+30 Storm Sewer Line A at Station 8+50 Storm Sewer Line A at Station 8+52 Storm Sewer Line A at Station 8+55