Loading...
Westhaven 2-LR130701 (2)TESTED FOR:DATE: 07/01/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 2420 07/01/13 FG-1.0 1 11.9 117.9 14.2 114 96 1-A 2421 07/01/13 FG 1 11.9 117.9 15.0 112 95 1-A 2422 07/01/13 FG-1.0 1 11.9 117.9 12.0 118 100 1-A 2423 07/01/13 FG 1 11.9 117.9 12.5 115 98 1-A 2424 07/01/13 FG-1.0 1 11.9 117.9 12.2 114 96 1-A 2425 07/01/13 FG 1 11.9 117.9 13.3 114 97 1-A 2426 07/01/13 FG-1.0 1 11.9 117.9 12.1 116 98 1-A TEST LOCATION: Phase 1 2420 2421 2422 2423 2424 2425 2426 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas Storm Sewer Line L at Station 1+20 Storm Sewer Line N at Station 1+30 Storm Sewer Line E at Station 1+05 Storm Sewer Line G at Station 1+00 Storm Sewer Line L at Station 1+15 DATETEST NO. Storm Sewer Line G at Station 1+05 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Storm Sewer Line E at Station 1+00 D. Hinton 130127-121 COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: TESTED FOR:DATE: 07/01/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 2427 07/01/13 FG 1 11.9 117.9 13.7 113 96 1-A 2428 07/01/13 FG-1.0 1 11.9 117.9 14.0 113 96 1-A 2429 07/01/13 FG 1 11.9 117.9 13.8 114 97 1-A 2430 07/01/13 FG-6.0 1 11.9 117.9 15.1 113 96 1-A 2431 07/01/13 FG-5.0 1 11.9 117.9 13.0 115 98 1-A 2432 07/01/13 FG-4.0 1 11.9 117.9 13.2 116 98 1-A 2433 07/01/13 FG-3.0 1 11.9 117.9 12.9 116 98 1-A TEST LOCATION: Phase 1 2427 2428 2429 2430 2431 2432 2433 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. D. Hinton 130127-121A COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: DATETEST NO. Storm Sewer 36" Line PD at Station 2+00 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Storm Sewer Line N at Station 1+35 Storm Sewer 36" Line PD at Station 2+05 Storm Sewer 36" Line PD at Station 2+08 Storm Sewer Line P at Station 1+15 Storm Sewer Line P at Station 1+20 Storm Sewer 36" Line PD at Station 2+02 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 07/01/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 2434 07/01/13 FG-2.0 1 11.9 117.9 13.8 114 97 1-A 2435 07/01/13 FG-1.0 1 11.9 117.9 13.9 113 96 1-A 2436 07/01/13 FG 1 11.9 117.9 14.5 113 96 1-A TEST LOCATION: Phase 1 2434 2435 2436 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas Storm Sewer 36" Line PD at Station 2+12 Storm Sewer 36" Line PD at Station 2+15 DATETEST NO. IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Storm Sewer 36" Line PD at Station 2+10 D. Hinton 130127-121B COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: