Loading...
Westhaven 2-LR130608 (2)TESTED FOR:DATE: 06/08/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 2326 06/08/13 FG-3.0 7 15.1 110.1 18.7 107 98 1-A 2327 06/08/13 FG-2.0 7 15.1 110.1 16.7 110 100 1-A 2328 06/08/13 FG-1.0 7 15.1 110.1 17.7 109 99 1-A 2329 06/08/13 FG-3.0 7 15.1 110.1 18.1 109 99 1-A 2330 06/08/13 FG-2.0 7 15.1 110.1 18.0 108 98 1-A 2331 06/08/13 FG-1.0 7 15.1 110.1 16.2 109 99 1-A 2332 06/08/13 FG-3.0 7 15.1 110.1 16.3 111 101 1-A TEST LOCATION: 2326 2327 2328 2329 2330 2331 2332 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Irving, Texas Water Along Banbury Road at Station 4+08 TEST NO. Water Along Banbury Road at Station 2+00 Don Hinton 130127-108 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving DATE Water Along Banbury Road at Station 4+00 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Water Along Banbury Road at Station 6+00 Water Along Banbury Road at Station 2+05 Water Along Banbury Road at Station 2+08 Water Along Banbury Road at Station 4+05 Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % TESTED FOR:DATE: 06/08/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 2333 06/08/13 FG-2.0 7 15.1 110.1 17.3 109 99 1-A 2334 06/08/13 FG-1.0 7 15.1 110.1 15.8 111 100 1-A 2335 06/08/13 FG-3.0 7 15.1 110.1 18.3 106 96 1-A 2336 06/08/13 FG-2.0 7 15.1 110.1 16.8 109 99 1-A 2337 06/08/13 FG-1.0 7 15.1 110.1 19.0 107 97 1-A 2338 06/08/13 FG-3.0 7 15.1 110.1 16.2 110 100 1-A 2339 06/08/13 FG-2.0 7 15.1 110.1 16.3 110 100 1-A TEST LOCATION: 2333 2334 2335 2336 2337 2338 2339 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Water Along Canterbury Court at Station 4+00 Water Along Canterbury Court at Station 4+2 IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Water Along Banbury Road at Station 6+05 Water Along Banbury Road at Station 6+08 Water Along Canterbury Court at Station 2+00 MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Water Along Canterbury Court at Station 2+03 Water Along Canterbury Court at Station 2+05 TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % Coppell, Texas TECHNICIAN: Don Hinton Irving, Texas Westhaven Phase 1 & 2 - Mass Grading 130127-108A REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Standard Pacific Homes - Irving TESTED FOR:DATE: 06/08/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 2340 06/08/13 FG-1.0 7 15.1 110.1 17.1 109 99 1-A 2341 06/08/13 FG-3.0 7 15.1 110.1 17.8 106 97 1-A 2342 06/08/13 FG-2.0 7 15.1 110.1 16.5 107 97 1-A 2343 06/08/13 FG-1.0 7 15.1 110.1 15.7 110 100 1-A 2344 06/08/13 FG-3.0 7 15.1 110.1 18.0 106 97 1-A 2345 06/08/13 FG-2.0 7 15.1 110.1 18.0 107 97 1-A 2346 06/08/13 FG-1.0 7 15.1 110.1 16.4 110 99 1-A TEST LOCATION:Westhaven Place Utilites 2333 2341 2342 2343 2344 2345 2346 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Water Along Canterbury Court at Station 8+05 Water Along Canterbury Court at Station 8+10 IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Water Along Canterbury Court at Station 4+05 Water Along Canterbury Court at Station 6+00 Water Along Canterbury Court at Station 6+05 MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Water Along Canterbury Court at Station 6+10 Water Along Canterbury Court at Station 8+00 TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % Coppell, Texas TECHNICIAN: Don Hinton Irving, Texas Westhaven Phase 1 & 2 - Mass Grading 130127-108B REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Standard Pacific Homes - Irving