Loading...
Westhaven 2-130429TESTED FOR:DATE: 04/29/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1937 04/29/13 FG-12.0 5 14.4 111.9 19.0 106 94 1-B 1938 04/29/13 FG-11.0 5 14.4 111.9 19.2 104 93 1-B 1939 04/29/13 FG-10.0 5 14.4 111.9 19.5 104 93 1-B 1940 04/29/13 FG-9.0 5 14.4 111.9 19.9 105 94 1-B 1941 04/29/13 FG-12.0 5 14.4 111.9 18.2 104 93 1-B 1942 04/29/13 FG-11.0 5 14.4 111.9 18.3 105 94 1-B 1943 04/29/13 FG-10.0 5 14.4 111.9 18.7 106 94 1-B TEST LOCATION: 1937 1938 1939 1940 1941 1942 1943 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas Sanitary Sewer Line A at Station 8+55 Sanitary Sewer Line A at Station 8+60 Sanitary Sewer Line A at Station 6+05 Sanitary Sewer Line A at Station 6+08 Sanitary Sewer Line A at Station 8+50 DATETEST NO. Sanitary Sewer Line A at Station 6+10 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Sanitary Sewer Line A at Station 6+00 Don Hinton 130127-89 COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: