Loading...
Westhaven 2-LR130322TESTED FOR:DATE: 03/22/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1624 03/22/13 FG-1.0 4 18.1 104.8 25.1 100 96 1-A 1625 03/22/13 FG 4 18.1 104.8 24.0 101 96 1-A 1626 03/22/13 FG-1.0 4 18.1 104.8 24.4 100 96 1-A 1627 03/22/13 FG 4 18.1 104.8 24.0 101 96 1-A 1628 03/22/13 FG-1.0 4 18.1 104.8 24.6 101 96 1-A 1629 03/22/13 FG 4 18.1 104.8 25.8 99 94 1-A 1630 03/22/13 FG-1.0 4 18.1 104.8 23.3 101 96 1-A TEST LOCATION: Detention Pond on Phase 1 - Clay Liner 1200' 1624 1625 1626 1627 1628 1629 1630 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas Bottom of Pond, 250' E of West End of Pond Bottom of Pond, 300' E of West End of Pond Bottom of Pond, 90' E of West End of Pond Bottom of Pond, 125' E of West End of Pond Bottom of Pond, 200' E of West End of Pond DATETEST NO. Bottom of Pond, 150' E of West End of Pond IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Bottom of Pond, 50' E of West End of Pond D. Hinton 130127-80 COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: TESTED FOR:DATE: 03/22/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1631 03/22/13 FG 4 18.1 104.8 24.3 100 95 1-A 1632 03/22/13 FG-1.0 4 18.1 104.8 23.6 101 96 1-A 1633 03/22/13 FG 4 18.1 104.8 24.4 100 95 1-A 1634 03/22/13 FG-1.0 6 18.6 102.8 24.0 100 97 1-A 1635 03/22/13 FG 6 18.6 102.8 22.3 101 98 1-A 1636 03/22/13 FG-1.0 6 18.6 102.8 21.5 102 99 1-A 1637 03/22/13 FG 6 18.6 102.8 23.0 100 97 1-A TEST LOCATION: Detention Pond on Phase 1 - Clay Liner 1200' 1631 1632 1633 1634 1635 1636 1637 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. D. Hinton 130127-80A COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: DATETEST NO. Bottom of Pond, 500' E of West End of Pond IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Bottom of Pond, 350' E of West End of Pond Bottom of Pond, 600' E of West End of Pond Bottom of Pond, 650' E of West End of Pond Bottom of Pond, 400' E of West End of Pond Bottom of Pond, 450' E of West End of Pond Bottom of Pond, 550' E of West End of Pond COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 03/22/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1638 03/22/13 FG-1.0 6 18.6 102.8 22.7 100 98 1-A 1639 03/22/13 FG 6 18.6 102.8 24.0 99 96 1-A 1640 03/22/13 FG-1.0 6 18.6 102.8 23.7 97 94 1-A 1641 03/22/13 FG 6 18.6 102.8 23.7 98 96 1-A 1642 03/22/13 FG-1.0 6 18.6 102.8 21.2 102 99 1-A 1643 03/22/13 FG 6 18.6 102.8 24.0 102 99 1-A 1644 03/22/13 FG-1.0 6 18.6 102.8 22.8 103 100 1-A TEST LOCATION: Detention Pond on Phase 1 - Clay Liner 1200' 1638 1639 1640 1641 1642 1643 1644 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas Bottom of Pond, 950' E of West End of Pond Bottom of Pond, 1000' E of West End of Pond Bottom of Pond, 750' E of West End of Pond Bottom of Pond, 800' E of West End of Pond Bottom of Pond, 900' E of West End of Pond DATETEST NO. Bottom of Pond, 850' E of West End of Pond IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Bottom of Pond, 700' E of West End of Pond D. Hinton 130127-80B COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: TESTED FOR:DATE: 03/22/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1645 03/22/13 FG 4 18.1 104.8 24.0 101 96 1-A 1646 03/22/13 FG-1.0 4 18.1 104.8 23.0 101 96 1-A 1647 03/22/13 FG 4 18.1 104.8 22.8 100 96 1-A 1648 03/22/13 FG-1.0 4 18.1 104.8 22.7 99 94 1-A 1649 03/22/13 FG 6 18.6 102.8 23.0 99 96 1-A 1650 03/22/13 FG-1.0 6 18.6 102.8 21.0 102 99 1-A 1651 03/22/13 FG 6 18.6 102.8 22.0 100 97 1-A TEST LOCATION: Detention Pond on Phase 1 - Clay Liner 1200' 1645 1646 1647 1648 1649 1650 1651 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. D. Hinton 130127-80C COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: DATETEST NO. Bottom of Pond, 200' W of East End of Pond IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Bottom of Pond, 1050' E of West End of Pond Bottom of Pond, 300' W of East End of Pond Bottom of Pond, 350' W of East End of Pond Bottom of Pond, 100' W of East End of Pond Bottom of Pond, 150' W of East End of Pond Bottom of Pond, 250' W of East End of Pond COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 03/22/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1652 03/22/13 FG-4.1 4 18.1 104.8 22.9 101 96 1-A 1653 03/22/13 FG-2.8 4 18.1 104.8 23.0 101 96 1-A 1654 03/22/13 FG-3.5 4 18.1 104.8 22.0 103 98 1-A 1655 03/22/13 FG-3.4 4 18.1 104.8 21.2 103 99 1-A 1656 03/22/13 FG-4.1 4 18.1 104.8 22.8 100 96 1-A 1657 03/22/13 FG-2.8 4 18.1 104.8 22.6 102 97 1-A 1658 03/22/13 FG-3.5 4 18.1 104.8 22.5 102 97 1-A TEST LOCATION: 1652 1653 1654 1655 1656 1657 1658 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas 12' N and 50' E of SW Corner of Block B, Lot 15 12' N and 50' E of SW Corner of Block B, Lot 16 45' S and 15' W of NE Corner of Block B, Lot 12 45' S and 15' W of NE Corner of Block B, Lot 13 12' N and 50' E of SW Corner of Block B, Lot 14 DATETEST NO. 45' S and 15' W of NE Corner of Block B, Lot 10 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 45' S and 15' W of NE Corner of Block B, Lot 11 D. Hinton 130127-80D COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: