Loading...
Westhaven 2-LR130329TESTED FOR:DATE: 03/29/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1876 03/29/13 FG-1.1 4 18.1 104.8 22.3 103 98 1-A 1877 03/29/13 FG-1.4 4 18.1 104.8 22.9 102 98 1-A 1878 03/29/13 FG-1.8 4 18.1 104.8 20.6 103 98 1-A 1879 03/29/13 FG-2.5 4 18.1 104.8 21.9 101 97 1-A 1880 03/29/13 FG-1.1 4 18.1 104.8 21.0 101 96 1-A 1881 03/29/13 FG-1.2 4 18.1 104.8 21.8 101 97 1-A 1882 03/29/13 FG-1.8 4 18.1 104.8 21.7 102 98 1-A TEST LOCATION:West haven Phase 2 1876 1877 1878 1879 1880 1881 1882 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Don Hinton 130127-86 COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Coppell, Texas West haven Phase 1 & 2 - Mass Grading TECHNICIAN: DATETEST NO. 10' S and 30' W from the NE Corner of Block C, Pad 6 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 10' S and 30' W from the NE Corner of Block C, Pad 2 30' S and 12' W from the NE Corner of Block C, Pad 10 10' S and 30' W from the NE Corner of Block C, Pad 16 10' S and 30' W from the NE Corner of Block C, Pad 3 10' S and 30' W from the NE Corner of Block C, Pad 4 30' S and 12' W from the NE Corner of Block C, Pad 8 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 03/29/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1883 03/29/13 FG-1.5 4 18.1 104.8 22.8 102 97 1-A 1884 03/29/13 FG-1.5 4 18.1 104.8 21.9 103 98 1-A 1885 03/29/13 FG-5.6 4 18.1 104.8 21.4 104 99 1-A 1886 03/29/13 FG-5.5 4 18.1 104.8 22.5 102 98 1-A 1887 03/29/13 FG-5.7 4 18.1 104.8 20.7 105 100 1-A 1888 03/29/13 FG-5.2 4 18.1 104.8 24.3 103 98 1-A 1889 03/29/13 FG-5.4 4 18.1 104.8 22.8 102 98 1-A TEST LOCATION:West haven Phase 2 1883 1884 1885 1886 1887 1888 1889 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas 10' S and 30' W from the NE Corner of Block D, Pad 8 35' S and 15' W from the NE Corner of Block D, Pad 2 10' S and 30' W from the NE Corner of Block C, Pad 18 10' S and 30' W from the NE Corner of Block D, Pad 1 10' S and 30' W from the NE Corner of Block D, Pad 7 DATETEST NO. 10' S and 30' W from the NE Corner of Block D, Pad 6 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 10' S and 30' W from the NE Corner of Block C, Pad 17 Don Hinton 130127-86A COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Coppell, Texas West haven Phase 1 & 2 - Mass Grading TECHNICIAN: TESTED FOR:DATE: 03/29/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1890 03/29/13 FG-3.6 5 14.4 111.9 18.2 107 96 1-A 1891 03/29/13 FG-4.1 5 14.4 111.9 18.3 109 98 1-A 1892 03/29/13 FG-4.4 5 14.4 111.9 18.5 108 97 1-A 1893 03/29/13 FG-1.5 5 14.4 111.9 17.3 111 99 1-A 1894 03/29/13 FG-3.6 5 14.4 111.9 17.9 108 97 1-A 1895 03/29/13 FG-4.5 5 14.4 111.9 17.2 108 96 1-A 1896 03/29/13 FG-4.7 5 14.4 111.9 19.0 109 97 1-A TEST LOCATION:West haven Phase 2 1890 1891 1892 1893 1894 1895 1896 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Don Hinton 130127-86B COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Coppell, Texas West haven Phase 1 & 2 - Mass Grading TECHNICIAN: DATETEST NO. 10' N and 25' E from the SW Corner of Block C, Pad 6 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 35' S and 15' W from the NE Corner of Block D, Pad 3 10' N and 25' E from the SW Corner of Block D, Pad 6 10' N and 25' E from the SW Corner of Block D, Pad 7 35' S and 15' W from the NE Corner of Block D, Pad 4 35' S and 15' W from the NE Corner of Block D, Pad 5 10' N and 25' E from the SW Corner of Block D, Pad 1 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 03/29/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1897 03/29/13 FG-4.2 5 14.4 111.9 17.8 109 97 1-A 1898 03/29/13 FG-4.4 5 14.4 111.9 18.4 108 96 1-A 1899 03/29/13 FG-2.6 5 14.4 111.9 20.0 108 97 1-A 1900 03/29/13 FG-3.1 5 14.4 111.9 17.4 110 98 1-A 1901 03/29/13 FG-3.4 1 11.9 117.9 13.1 114 97 1-A 1902 03/29/13 1 11.9 117.9 15.0 116 98 1-A 1903 03/29/13 1 11.9 117.9 12.2 117 99 1-A TEST LOCATION:West haven Phase 2 1897 1898 1899 1900 1901 1902 1903 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas 15' S and 40' W from the NE Corner of Block E, Pad 1 15' S and 40' W from the NE Corner of Block E, Pad 3 30' N and 12' E from the SW Corner of Block D, Pad 2 30' N and 12' E from the SW Corner of Block D, Pad 3 30' N and 12' E from the SW Corner of Block D, Pad 5 DATETEST NO. 30' N and 12' E from the SW Corner of Block D, Pad 4 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 10' N and 25' E from the SW Corner of Block D, Pad 8 Don Hinton 130127-86C COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Coppell, Texas West haven Phase 1 & 2 - Mass Grading TECHNICIAN: TESTED FOR:DATE: 03/29/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1904 03/29/13 SG 1 11.9 117.9 11.9 116 99 2-A 1905 03/29/13 SG 1 11.9 117.9 11.7 118 100 2-A 1906 03/29/13 SG 1 11.9 117.9 11.8 118 100 2-A 1907 03/29/13 SG 1 11.9 117.9 12.7 116 98 2-A 1908 03/29/13 SG 1 11.9 117.9 14.5 114 97 2-A 1909 03/29/13 SG 1 11.9 117.9 13.2 118 100 2-A 1910 03/29/13 SG 2 9.2 124.4 12.2 119 96 2-A TEST LOCATION:West haven Phase 2 1904 1905 1906 1907 1908 1909 1910 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Don Hinton 130127-86D COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Coppell, Texas West haven Phase 1 & 2 - Mass Grading TECHNICIAN: DATETEST NO. 15' S and 40' W from the NE Corner of Block E, Pad 11 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 15' S and 40' W from the NE Corner of Block E, Pad 5 15' S and 40' W from the NE Corner of Block E, Pad 15 15' S and 40' W from the NE Corner of Block E, Pad 17 15' S and 40' W from the NE Corner of Block E, Pad 7 15' S and 40' W from the NE Corner of Block E, Pad 9 15' S and 40' W from the NE Corner of Block E, Pad 13 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas