Loading...
Westhaven 2-LR130328TESTED FOR:DATE: 03/28/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1834 03/28/13 FG-1.0 4 18.1 104.8 22.4 102 98 1-A 1835 03/28/13 FG 4 18.1 104.8 23.0 102 97 1-A 1836 03/28/13 FG-1.0 4 18.1 104.8 22.7 103 98 1-A 1837 03/28/13 FG 4 18.1 104.8 20.5 102 98 1-A 1838 03/28/13 FG-1.0 4 18.1 104.8 20.8 104 100 1-A 1839 03/28/13 FG 4 18.1 104.8 20.5 105 100 1-A 1840 03/28/13 FG-1.0 4 18.1 104.8 20.2 103 99 1-A TEST LOCATION: Westhaven Phase 2, Detention Pond along Block F, Pads 1 through 15 1834 1835 1836 1837 1838 1839 1840 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. D. Hinton 130127-85 COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: DATETEST NO. Detention Pond, 200' E of West End of Pond, Clay Bottom IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Detention Pond, 75' E of West End of Pond, Clay Bottom Detention Pond, 300' E of West End of Pond, Clay Bottom Detention Pond, 350' E of West End of Pond, Clay Bottom Detention Pond, 100' E of West End of Pond, Clay Bottom Detention Pond, 150' E of West End of Pond, Clay Bottom Detention Pond, 250' E of West End of Pond, Clay Bottom COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 03/28/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1841 03/28/13 FG 4 18.1 104.8 20.5 105 100 1-A 1842 03/28/13 FG-1.0 4 18.1 104.8 22.1 102 97 1-A 1843 03/28/13 FG 4 18.1 104.8 22.7 102 97 1-A 1844 03/28/13 FG-1.0 4 18.1 104.8 22.6 103 98 1-A 1845 03/28/13 FG 4 18.1 104.8 21.1 105 100 1-A 1846 03/28/13 FG-1.0 4 18.1 104.8 21.0 103 98 1-A 1847 03/28/13 FG 4 18.1 104.8 22.5 102 97 1-A TEST LOCATION: Westhaven Phase 2, Detention Pond along Block F, Pads 1 through 15 1841 1842 1843 1844 1845 1846 1847 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas Detention Pond, 600' E of West End of Pond, Clay Bottom Detention Pond, 650' E of West End of Pond, Clay Bottom Detention Pond, 400' E of West End of Pond, Clay Bottom Detention Pond, 450' E of West End of Pond, Clay Bottom Detention Pond, 550' E of West End of Pond, Clay Bottom DATETEST NO. Detention Pond, 500' E of West End of Pond, Clay Bottom IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Detention Pond, 360' E of West End of Pond, Clay Bottom D. Hinton 130127-85A COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: TESTED FOR:DATE: 03/28/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1848 03/28/13 FG-5.2 1 11.9 117.9 14.8 113 96 1-A 1849 03/28/13 FG-5.5 1 11.9 117.9 14.0 115 98 1-A 1850 03/28/13 FG-5.8 1 11.9 117.9 12.4 118 100 1-A 1851 03/28/13 FG-6.5 1 11.9 117.9 12.5 116 98 1-A 1852 03/28/13 FG-6.0 1 11.9 117.9 14.1 115 97 1-A 1853 03/28/13 FG-6.2 1 11.9 117.9 12.9 117 99 1-A 1854 03/28/13 FG-5.5 1 11.9 117.9 13.2 115 98 1-A TEST LOCATION: 1848 1849 1850 1851 1852 1853 1854 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. D. Hinton 130127-85B COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: DATETEST NO. 12' S and 30' E from NW Corner of Block F, Lot 9 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 12' S and 30' E from NW Corner of Block F, Lot 6 12' S and 30' E from NW Corner of Block F, Lot 11 12' S and 30' E from NW Corner of Block F, Lot 12 12' S and 30' E from NW Corner of Block F, Lot 7 12' S and 30' E from NW Corner of Block F, Lot 8 12' S and 30' E from NW Corner of Block F, Lot 10 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 03/28/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1855 03/28/13 FG-5.5 1 11.9 117.9 12.6 118 100 1-A 1856 03/28/13 FG-3.6 1 11.9 117.9 12.0 118 100 1-A 1857 03/28/13 FG-3.9 1 11.9 117.9 12.1 117 99 1-A 1858 03/28/13 FG-4.0 1 11.9 117.9 14.2 115 97 1-A 1859 03/28/13 FG-2.3 1 11.9 117.9 13.5 118 100 1-A 1860 03/28/13 FG-3.7 1 11.9 117.9 15.2 114 97 1-A 1861 03/28/13 FG-3.0 1 11.9 117.9 15.5 114 97 1-A TEST LOCATION: 1855 1856 1857 1858 1859 1860 1861 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas 12' S and 30' E from NW Corner of Block F, Lot 3 12' S and 30' E from NW Corner of Block F, Lot 15 12' S and 30' E from NW Corner of Block F, Lot 14 12' S and 30' E from NW Corner of Block F, Lot 5 12' S and 30' E from NW Corner of Block F, Lot 2 DATETEST NO. 12' S and 30' E from NW Corner of Block F, Lot 4 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 12' S and 30' E from NW Corner of Block F, Lot 13 D. Hinton 130127-85C COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: TESTED FOR:DATE: 03/28/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1862 03/28/13 FG-4.2 5 14.4 111.9 17.8 108 96 1-A 1863 03/28/13 FG-4.5 5 14.4 111.9 17.3 109 97 1-A 1864 03/28/13 FG-4.8 5 14.4 111.9 18.9 107 96 1-A 1865 03/28/13 FG-5.5 5 14.4 111.9 17.4 108 97 1-A 1866 03/28/13 FG-5.0 5 14.4 111.9 18.2 107 95 1-A 1867 03/28/13 FG-5.2 5 14.4 111.9 17.3 110 99 1-A 1868 03/28/13 FG-4.5 5 14.4 111.9 18.0 110 98 1-A TEST LOCATION: 1862 1863 1864 1865 1866 1867 1868 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. D. Hinton 130127-85D COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: DATETEST NO. 10' N and 25' W from SE Corner of Block F, Lot 9 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 10' N and 25' W from SE Corner of Block F, Lot 6 10' N and 25' W from SE Corner of Block F, Lot 11 10' N and 25' W from SE Corner of Block F, Lot 12 10' N and 25' W from SE Corner of Block F, Lot 7 10' N and 25' W from SE Corner of Block F, Lot 8 10' N and 25' W from SE Corner of Block F, Lot 10 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 03/28/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1869 03/28/13 FG-4.5 5 14.4 111.9 18.4 109 97 1-A 1870 03/28/13 FG-7.0 5 14.4 111.9 17.7 108 96 1-A 1871 03/28/13 FG-8.0 5 14.4 111.9 18.3 107 95 1-A 1872 03/28/13 FG-8.8 5 14.4 111.9 18.3 108 97 1-A 1873 03/28/13 FG-8.3 5 14.4 111.9 17.3 110 98 1-A 1874 03/28/13 FG-9.5 5 14.4 111.9 16.5 111 99 1-A 1875 03/28/13 FG-9.2 5 14.4 111.9 16.4 112 100 1-A TEST LOCATION: 1869 1870 1871 1872 1873 1874 1875 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas 10' N and 25' W from SE Corner of Block F, Lot 20 10' N and 25' W from SE Corner of Block F, Lot 21 10' N and 25' W from SE Corner of Block F, Lot 16 10' N and 25' W from SE Corner of Block F, Lot 17 10' N and 25' W from SE Corner of Block F, Lot 19 DATETEST NO. 10' N and 25' W from SE Corner of Block F, Lot 18 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 10' N and 25' W from SE Corner of Block F, Lot 13 D. Hinton 130127-85E COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: