Loading...
Westhaven 2-LR130330TESTED FOR:DATE: 03/30/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1911 03/30/13 FG-2.6 2 9.2 124.4 12.5 120 96 1-A 1912 03/30/13 FG-3.4 2 9.2 124.4 12.0 118 95 1-A 1913 03/30/13 FG-1.6 2 9.2 124.4 11.5 120 97 1-A 1914 03/30/13 FG-2.1 2 9.2 124.4 11.0 122 98 1-A 1915 03/30/13 FG-2.4 2 9.2 124.4 11.0 119 96 1-A 1916 03/30/13 FG-3.5 2 9.2 124.4 10.5 119 95 1-A 1917 03/30/13 FG-3.7 1 11.9 117.9 12.5 115 98 1-A TEST LOCATION: 1911 1912 1913 1914 1915 1916 1917 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. D. Hinton 130127-87 COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: DATETEST NO. 15' S and 10' E from NW Corner of Block D, Lot 4 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 15' S and 35' W from NE Corner of Block D, Lot 1 15' S and 35' W from NE Corner of Block D, Lot 6 15' S and 35' W from NE Corner of Block D, Lot 7 15' S and 10' E from NW Corner of Block D, Lot 2 15' S and 10' E from NW Corner of Block D, Lot 3 15' S and 10' E from NW Corner of Block D, Lot 5 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 03/30/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1918 03/30/13 FG-3.2 1 11.9 117.9 12.0 117 99 1-A 1919 03/30/13 FG-1.6 1 11.9 117.9 13.5 115 97 1-A 1920 03/30/13 FG-2.4 1 11.9 117.9 12.2 114 96 1-A 1921 03/30/13 FG-1.1 1 11.9 117.9 13.3 114 97 1-A 1922 03/30/13 FG-1.4 1 11.9 117.9 12.2 115 98 1-A 1923 03/30/13 FG-2.5 2 9.2 124.4 10.6 122 98 1-A 1924 03/30/13 FG-2.7 2 9.2 124.4 9.8 125 100 1-A TEST LOCATION: 1918 1919 1920 1921 1922 1923 1924 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas 10' N and 35' W from NE Corner of Block D, Lot 6 10' N and 35' W from NE Corner of Block D, Lot 7 10' N and 25' E from SW Corner of Block D, Lot 1 20' N and 10' E from SE Corner of Block D, Lot 2 20' N and 10' E from SE Corner of Block D, Lot 5 DATETEST NO. 20' N and 10' E from SE Corner of Block D, Lot 4 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 15' S and 35' W from NE Corner of Block D, Lot 8 D. Hinton 130127-87A COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: TESTED FOR:DATE: 03/30/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1925 03/30/13 FG-2.2 1 11.9 117.9 15.5 113 96 1-A 1926 03/30/13 FG-1.4 1 11.9 117.9 13.8 114 97 1-A 1927 03/30/13 FG-1.5 1 11.9 117.9 14.7 116 98 1-A 1928 03/30/13 FG-1.7 2 9.2 124.4 11.5 122 98 1-A 1929 03/30/13 FG-1.2 2 9.2 124.4 11.2 123 99 1-A TEST LOCATION: 1925 1926 1927 1928 1929 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. D. Hinton 130127-87B COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: DATETEST NO. 15' S and 40' E from NE Corner of Block D, Lot 7 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 10' N and 35' W from SE Corner of Block D, Lot 8 30' N and 15' E from SW Corner of Block D, Lot 2 15' S and 40' E from NE Corner of Block D, Lot 6 15' S and 40' E from NE Corner of Block D, Lot 8 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas