Loading...
Westhaven 2-LR130326TESTED FOR:DATE: 03/26/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1750 03/26/13 FG-2.0 6 18.6 102.8 23.9 102 99 1-A 1751 03/26/13 FG-1.4 6 18.6 102.8 21.8 101 98 1-A 1752 03/26/13 FG-2.9 6 18.6 102.8 23.9 99 96 1-A 1753 03/26/13 FG-1.2 6 18.6 102.8 22.4 100 97 1-A 1754 03/26/13 FG-1.6 6 18.6 102.8 23.0 98 95 1-A 1755 03/26/13 FG-1.4 6 18.6 102.8 22.3 100 97 1-A 1756 03/26/13 FG-2.1 6 18.6 102.8 23.8 98 95 1-A TEST LOCATION: 1750 1751 1752 1753 1754 1755 1756 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. D. Hinton 130127-83 COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: DATETEST NO. 12' S and 25' W from NE Corner of Bock B, Lot 8 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 12' S and 25' W from NE Corner of Bock B, Lot 5 30' S and 15' W from NE Corner of Bock B, Lot 10 30' S and 15' W from NE Corner of Bock B, Lot 11 12' S and 25' W from NE Corner of Bock B, Lot 6 12' S and 25' W from NE Corner of Bock B, Lot 7 12' S and 25' W from NE Corner of Bock B, Lot 9 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 03/26/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1757 03/26/13 FG-1.5 6 18.6 102.8 22.5 99 97 1-A 1758 03/26/13 FG-1.2 6 18.6 102.8 23.3 98 96 1-A 1759 03/26/13 FG-1.4 6 18.6 102.8 23.0 100 97 1-A 1760 03/26/13 FG-1.7 6 18.6 102.8 21.8 98 96 1-A 1761 03/26/13 FG-2.8 6 18.6 102.8 21.3 102 99 1-A 1762 03/26/13 FG-2.4 6 18.6 102.8 23.2 99 96 1-A 1763 03/26/13 FG-2.9 6 18.6 102.8 23.0 98 95 1-A TEST LOCATION: 1757 1758 1759 1760 1761 1762 1763 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas 10' S and 45' W from NE Corner of Bock B, Lot 24 10' S and 45' W from NE Corner of Bock B, Lot 25 10' S and 45' W from NE Corner of Bock B, Lot 17 10' S and 45' W from NE Corner of Bock B, Lot 21 10' S and 45' W from NE Corner of Bock B, Lot 23 DATETEST NO. 10' S and 45' W from NE Corner of Bock B, Lot 22 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 30' S and 15' W from NE Corner of Bock B, Lot 13 D. Hinton 130127-83A COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: TESTED FOR:DATE: 03/26/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1764 03/26/13 FG-1.7 6 18.6 102.8 23.0 99 96 1-A 1765 03/26/13 FG-2.1 4 18.1 104.8 20.4 103 99 1-A 1766 03/26/13 FG-1.4 4 18.1 104.8 20.5 102 97 1-A 1767 03/26/13 FG-1.7 4 18.1 104.8 20.3 103 98 1-A 1768 03/26/13 FG-1.0 5 14.4 111.9 17.5 109 98 1-A 1769 03/26/13 FG-1.3 5 14.4 111.9 16.4 111 99 1-A 1770 03/26/13 FG-1.5 5 14.4 111.9 17.1 111 99 1-A TEST LOCATION: 1764 1765 1766 1767 1768 1769 1770 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. D. Hinton 130127-83B COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: DATETEST NO. 10' S and 45' W from NE Corner of Bock B, Lot 29 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 10' S and 45' W from NE Corner of Bock B, Lot 26 10' S and 45' W from NE Corner of Bock B, Lot 31 10' S and 45' W from NE Corner of Bock B, Lot 33 10' S and 45' W from NE Corner of Bock B, Lot 27 10' S and 45' W from NE Corner of Bock B, Lot 28 10' S and 45' W from NE Corner of Bock B, Lot 30 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 03/26/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1771 03/26/13 FG-1.1 5 14.4 111.9 18.3 107 95 1-A 1772 03/26/13 FG-2.0 5 14.4 111.9 17.7 109 98 1-A 1773 03/26/13 FG-1.1 5 14.4 111.9 18.6 108 96 1-A 1774 03/26/13 FG-1.0 5 14.4 111.9 17.6 108 97 1-A 1775 03/26/13 FG-2.4 5 14.4 111.9 19.0 107 96 1-A 1776 03/26/13 FG-2.5 5 14.4 111.9 18.9 108 97 1-A 1777 03/26/13 FG-2.6 5 14.4 111.9 18.8 108 96 1-A TEST LOCATION: 1771 1772 1773 1774 1775 1776 1777 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas 10' S and 45' W from NE Corner of Bock B, Lot 44 10' S and 45' W from NE Corner of Bock B, Lot 45 10' S and 45' W from NE Corner of Bock B, Lot 35 10' S and 45' W from NE Corner of Bock B, Lot 39 10' S and 45' W from NE Corner of Bock B, Lot 43 DATETEST NO. 10' S and 45' W from NE Corner of Bock B, Lot 41 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 10' S and 45' W from NE Corner of Bock B, Lot 34 D. Hinton 130127-83C COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: TESTED FOR:DATE: 03/26/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1778 03/26/13 FG-1.6 5 14.4 111.9 19.7 107 95 1-A 1779 03/26/13 FG-1.6 5 14.4 111.9 18.5 108 97 1-A 1780 03/26/13 FG-1.4 5 14.4 111.9 18.6 107 96 1-A 1781 03/26/13 FG-2.6 5 14.4 111.9 17.7 109 97 1-A 1782 03/26/13 FG-2.8 5 14.4 111.9 19.1 108 96 1-A 1783 03/26/13 FG-1.0 5 14.4 111.9 18.2 110 98 1-A 1784 03/26/13 FG-1.4 5 14.4 111.9 18.8 107 96 1-A TEST LOCATION: 1778 1779 1780 1781 1782 1783 1784 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. D. Hinton 130127-83D COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: DATETEST NO. 35' N and 15' E from SW Corner of Bock B, Lot 49 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 10' S and 45' W from NE Corner of Bock B, Lot 46 12' N and 30' E from SW Corner of Bock B, Lot 41 12' N and 30' E from SW Corner of Bock B, Lot 43 10' S and 45' W from NE Corner of Bock B, Lot 47 10' S and 45' W from NE Corner of Bock B, Lot 48 35' N and 15' E from SW Corner of Bock B, Lot 50 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 03/26/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 1785 03/26/13 FG-1.5 5 14.4 111.9 18.8 110 98 1-A 1786 03/26/13 FG-1.6 5 14.4 111.9 19.4 107 96 1-A 1787 03/26/13 FG-1.6 5 14.4 111.9 18.1 110 98 1-A 1788 03/26/13 FG-1.8 5 14.4 111.9 18.5 108 97 1-A 1789 03/26/13 FG-1.0 5 14.4 111.9 18.6 108 96 1-A 1790 03/26/13 FG-1.1 5 14.4 111.9 19.0 109 97 1-A 1791 03/26/13 FG-1.9 5 14.4 111.9 16.5 112 100 1-A TEST LOCATION: 1785 1786 1787 1788 1789 1790 1791 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas 12' N and 30' E from SW Corner of Bock B, Lot 27 12' N and 30' E from SW Corner of Bock B, Lot 25 12' N and 30' E from SW Corner of Bock B, Lot 45 12' N and 30' E from SW Corner of Bock B, Lot 49 12' N and 30' E from SW Corner of Bock B, Lot 35 DATETEST NO. 12' N and 30' E from SW Corner of Bock B, Lot 50 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 12' N and 30' E from SW Corner of Bock B, Lot 44 D. Hinton 130127-83E COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Phase 1 & 2 - Mass Grading Coppell, Texas TECHNICIAN: