Westhaven 2-LR130225TESTED FOR:DATE: 02/25/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 844 02/25/13 SG 4 18.1 104.8 23.9 101 96 2-A 845 02/25/13 FG-4.5 4 18.1 104.8 24.0 98 94 1-A 846 02/25/13 FG-4.0 4 18.1 104.8 24.3 98 94 1-A 847 02/25/13 FG-3.5 4 18.1 104.8 23.5 100 96 1-A 848 02/25/13 FG-3.0 4 18.1 104.8 23.8 101 96 1-A 849 02/25/13 SG 4 18.1 104.8 23.5 100 95 2-A 850 02/25/13 FG-4.5 4 18.1 104.8 24.1 101 96 1-A TEST LOCATION: 844 845 846 847 848 849 850 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Don Hinton 130127-47 COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Coppell, Texas TECHNICIAN: DATETEST NO. 40' N and 20' E from the SW Corner of Block M, Pad 9 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 35' N and 25' W from the SE Corner of Block M, Pad 9 60' N and 20' W from the SE Corner of Block M, Pad 10 35' S and 15' E from the NW Corner of Block M, Pad 10 20' S and 20' E from the SW Corner of Block M, Pad 9 45' S and 15' W from the NE Corner of Block M, Pad 9 55' S and 25' W from the NE Corner of Block M, Pad 9 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 02/25/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 851 02/25/13 FG-4.0 4 18.1 104.8 24.3 100 96 1-A 852 02/25/13 FG-3.5 4 18.1 104.8 24.5 98 94 1-A 853 02/25/13 FG-3.0 4 18.1 104.8 24.1 100 95 1-A 854 02/25/13 FG-2.5 4 18.1 104.8 23.3 100 95 1-A 855 02/25/13 FG-2.5 4 18.1 104.8 23.0 101 96 1-A 856 02/25/13 FG-2.0 4 18.1 104.8 24.6 99 94 1-A 857 02/25/13 FG-2.0 4 18.1 104.8 23.9 100 95 1-A TEST LOCATION: 851 852 853 854 855 856 857 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas 40' N and 20' E from the SW Corner of Block M, Pad 9 30' N and 20' E from the SW Corner of Block M, Pad 10 35' S and 15' W from the NE Corner of Block M, Pad 10 55' S and 20' E from the SW Corner of Block M, Pad 10 60' N and 25' W from the SE Corner of Block M, Pad 10 DATETEST NO. 35' S and 20' W from the NE Corner of Block M, Pad 9 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER 45' N and 25' E from the SW Corner of Block M, Pad 10 Don Hinton 130127-47A COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Coppell, Texas TECHNICIAN: TESTED FOR:DATE: 02/25/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 858 02/25/13 FG-5.0 4 18.1 104.8 21.8 101 96 1-A 859 02/25/13 FG-4.0 4 18.1 104.8 20.6 103 99 1-A 860 02/25/13 FG-5.0 4 18.1 104.8 20.8 103 98 1-A 861 02/25/13 FG-4.0 4 18.1 104.8 22.0 102 97 1-A 862 02/25/13 FG-4.0 4 18.1 104.8 21.0 102 97 1-A 863 02/25/13 FG-3.0 4 18.1 104.8 21.4 102 97 1-A 864 02/25/13 FG-1.0 4 18.1 104.8 21.5 104 100 1-A TEST LOCATION:Paving Phase I 858 859 860 861 862 863 864 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Don Hinton 130127-47B COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Coppell, Texas TECHNICIAN: DATETEST NO. Spring Lake Way at Station 8+25 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Spring Lake Way at Station 5+00 Spring Lake Way at Station 10+50 Spring Lake Way at Station 2+50 Spring Lake Way at Station 5+50 Spring Lake Way at Station 8+00 Spring Lake Way at Station 10+00 COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas TESTED FOR:DATE: 02/25/13 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 865 02/25/13 FG-3.0 4 18.1 104.8 21.2 104 99 1-A 866 02/25/13 FG-2.0 4 18.1 104.8 21.9 102 97 1-A 867 02/25/13 FG-3.0 4 18.1 104.8 22.0 103 98 1-A 868 02/25/13 FG-2.0 4 18.1 104.8 20.6 102 98 1-A 869 02/25/13 FG-2.0 4 18.1 104.8 21.7 101 97 1-A 870 02/25/13 FG-1.0 4 18.1 104.8 21.8 100 95 1-A 871 02/25/13 FG-1.0 4 18.1 104.8 20.7 103 98 1-A TEST LOCATION:Paving Westhaven I 865 866 867 868 869 870 871 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. COMPACTION TESTS REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Irving Irving, Texas Spring Lake Way at Station 8+00 Spring Lake Way at Station 5+00 Spring Lake Way at Station 5+00 Spring Lake Way at Station 8+00 Spring Lake Way at Station 10+00 DATETEST NO. Spring Lake Way at Station 8+15 IN PLACE DRY DENSITY PCF PERCENT COMPACTION SOIL ID NUMBER Spring Lake Way at Station 4+50 Don Hinton 130127-47C COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Westhaven Coppell, Texas TECHNICIAN: