ST0502A-LR150414G I _GEOTECFINICAL ENGINEERING
E It - ENVIRONMENTAL CONSULTING
• CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972
Report Date: May 12, 2015 Date Concrete Placed: April 14, 2015 Standard 6"xl2" Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 166
Contractor: CD Builders Inc. Project No.: 214-0144
Concrete Supplier and Plant: Argos 110
Location of Placement: North; South Approach Slab Bridge Stage 2
MATERIALS Source / SSD Batch Wts. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number: 1251
Cement:
Fly Ash:
Coarse Aggregate:
Intermediate Aggregate:
Fine Aggregate:
Admixtures:
2
Added Water: 0
Time Sample Batched:
Time Sampled:
Sample Location:
8:14 AM
8:40 AM
North; South Approach to
Slab Bridge Stage 2
Truck / Ticket No: 5017/1598681
Temperature:
Ambient Range:
56 OF
Concrete Range:
70 OF
Slump Range (inches):
3.5
Weather Conditions:
Cloudy
Time Started:
7:00 AM
Time Completed:
3:15 PM
Sample Air Content
3.4
Total Cubic Yards Placed:
20
Reouired Strength (Lbs./so.in.):
4000
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compressive Strength
(Lbs./Sq.1n.)
Remarks
FPP 661
7
4/21/15
127,520
4,510
FPP 662
3.5
28
5/12/15
142,680+
5,050+
FPP 663
28
5/12/15
145,080+
5,130+
FPP 664
H
Hold
I
I
Test Methods Utilized
Fracture Regular
Cylinders Made By: CP
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Remarks and/or Distribution:- None
cc: Rick Odell <ROdell@coppelltx.gov>
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: Ve4y
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
- GEOTECHNICAL ENGINEERING
- ENVIRONMENTAL CONSULTING
E I -CONSTRUCTION MATERIALS TESTING
GEE Consultantts, Inc.
10046 Monroe Drive - Dallas, Texas 75229 • {2'14) 3.52-5433 - Fax 12 1 41 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Measured
Slump (in.)
Report Date:
May 12, 2015 Date Concrete Placed: April 14, 2015
Standard 6"xl2" Cylinders
Client:
City of Coppell
Cylinder Cross-sectional Area: 28.27 Square Inches
Project:
Freeport Pkwy from Ruby Rd. to Sandy Lake Rd.
Concrete Report No.: 167
Contractor:
CD Builders Inc.
Project No.: 214-0144
Concrete Supplier and Plant:
Argos 110
5/12/15
142,160+
Location of Placement:
Pavement, North Bound STA 15+00
FPP 667
4.5
MATERIALS
Source / SSD Batch Wts.
OBSERVATION DATA
5,160+
Description (Lbs/CuYd)
H
Hold
Mix Number:
1273
Time Sample Batched:
11:40 AM
Cement:
Cylinders Made By: CP
Time Sampled:
12:30 AM
Sample Location:
Pavement, North Bound STA
Fly Ash:
15+00
Coarse Aggregate:
Truck I Ticket No:
6018!1598776
Intermediate Aggregate:
Temperature:
Fine Aggregate:
Ambient Range:
58 OF
Admixtures:
Concrete Range:
72 OF
1
Slump Range (inches):
4.5
2
Weather Conditions:
Cloudy
Added Water:
0
Time Started:
7:00 AM
Time Completed:
3:15 PM
Sample Air Content (%):
5.0
Total Cubic Yards Placed:
10
v e,,,,;, A Qt- fl, tT he /en in V
'1600
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compressive Strength
(Lbs./Sq.ln,)
Remarks
FPP 665
7
4/21/15
127,940+
4,530+
FPP 666
28
5/12/15
142,160+
5,030+
FPP 667
4.5
28
5/12/15
145,880+
5,160+
FPP 668
H
Hold
Test Methods Utilized
Fracture Regular
Cylinders Made By: CP
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Remarks and/or Distribution:- None
cc: Rick Odell <ROdell@eoppelltx.gov>
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
I TE Firm: F-3212 Reviewed
GEE Consultants, ne.—
lne. The use of -our name must
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants,
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products,
• GEOTECHNICAL ENGINEERING
r—El • ENVIRONMENTAL CONSULTING
• CONSTRUCTION MATERIALS TESTING
GEE Consultan*,-nf
10046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972
Report Date: May 12, 2015 Date Concrete Placed:
Client. City of Coppell
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd.
Contractor: CD Builders Inc.
Concrete Supplier and Plant: Argos #11 1
Location of placement: North approach slab step down
April 13, 2015 Standard 6"x12" Cylinders
Cylinder Cross-sectional Area: 28.27 Square Inches
Concrete Report No.: 168
Project No.: 214-0144
MATERIALS Source / SSD Batch Wts. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number:
Cement:
Fly Ash:
Coarse Aggregate:
Intermediate Aggregate:
Fine Aggregate:
Admixtures:
1
2
Added Water:
1251 Time Sample Batched:
7:46 AM
Time Sampled:
9:05 AM
Sample Location:
North approach slab step down
Truck / Ticket No:
4027 /1598534
Temperature:
7
Ambient Range:
70 OF
Concrete Range:
76 OF
Slump Range (inches):
5.0
Weather Conditions:
Cloudy
Time Started:
8:00 AM
0 Time Completed:
10:45 PM
Sample Air Content (%):
3.4
Total Cubic Yards Placed:
10
rlamiirari C+r _+i, /r I" /...
\. Annn
Specimen
Number
Measured
Slump (in.)
Age
(Days)
y)
Date
Tested
Total Load
(Lbs.)
Compressive Strength
(Lbs.lSq.In.)
Remarks
FPP 657
7
4/20/15
117,700
4,160
FPP 658
5.0
28
5/11/15
143,720+
5,080+
FPP 659
28
5/11/15
151,720+
5,370+
FPP 660
H
Hold
Test Methods Utilized
Fracture Regular
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Cylinders Made By: CP
Kemarks and/or Distribution:- None
cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
Gi -GEOTECFiNICAL ENGINEERING
LE -ENVIRONMENTAL CONSULTING GEE Consultants, Inc
E • CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive Dallas, Texas 75229 0 (214) 3522-5433 Fax (2 14) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Report Date: May 12, 2015 Date Concrete Placed: May 4, 2015 Standard 6"x12" Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 190
Contractor: CD Builders Project No.: 214-0144
Concrete Supplier and Plant: Agros 110
Location of Placement: Paving Decel Lane and Median Crossing STA 1+50 to 2+50
MATERIALS Source / SSD Batch Wts. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number: 1273
Time Sample Batched:
12:02 PM
Cement:
Time Sampled:
12:25 PM
Fly Ash:
Sample Location:
Paving Decel Lane and Median
Coarse Aggregate:
5/11/15
Crossing STA 1+50 to 2+50
Intermediate Aggregate:
Truck / Ticket No:
5017/1609096
Fine Aggregate:
Temperature:
6/1/15
Ambient Range:
75 OF
Admixtures:
Concrete Range:
80 OF
I
Slump Range (inches):
3.5
2
Weather Conditions:
Mostly Cloudy
Added Water: 0
Time Started:
10:00 AM
Time Completed:
4:45 PM
Sample Air Content
3.8
Total Cubic Yards Placed:
10
Test Methods Utilized
Required Strength (Lbs./sa.in.):
3600
Specimen
Number
Measured
Slump (ill.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compressive Strength
(Lbs./Sq.1n.)
Remarks
FPP 725
7
5/11/15
127,860+
4,520
FPP 726
28
6/1/15
3.5
FPP 727
28
6/1/15
FPP 728
H
Hold
Test Methods Utilized
Fracture Regular
Cylinders Made By: CP
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Remarks and/or Distribution:- None
cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell@coppelltx.gov
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The useirifour name must
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
• GEOTECHNICAL ENGINEERING
• ENVIRONMENTAL CONSULTING
E I -CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive • Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972
I t t
Report Date: May 12, 2015 Date Concrete Placed:
Client: City of Coppell
Project: Free port Pkwy from Ruby Rd. to Sandy Lake Rd.
Contractor: CD Builders
Concrete Supplier and Plant: Agros 110
Location of Placement: Paving Median Crossing STA 9+30 to 10+50
May 5, 2015 Standard 6"x12" Cylinders
Cylinder Cross-sectional Area: 28.27 Square Inches
Concrete Report No.: 191
Project No.: 214-0144
MATERIALS Source / SSD Batch Wts. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number: 1273
Cement:
Fly Ash:
Coarse Aggregate:
Intermediate Aggregate:
Fine Aggregate:
Admixtures:
1
2
Added Water: 0
Time Sample Batched:
Time Sampled:
Sample Location:
10:29 AM
11:00 AM
Paving Median Crossing STA
9+30 to 10+50
Truck / Ticket No: 4046/1609940
Temperature:
Measured
Slump (in.)
Ambient Range:
74 OF
Concrete Range:
86 OF
Slump Range (inches):
3.5
Weather Conditions:
Mostly Cloudy
Time Started:
9:30 AM
Time Completed:
3:30 PM
Sample Air Content
4.2
Total Cubic Yards Placed:
10
Rennired qrrenoth (I.h-, lqn in
)- 3600
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compressive Strength
(Lbs./Sq.1n.)
Remarks
FPP 729
7
5/12/15
128,380+
4,540+
FPP 730
28
6/2/15
3.5
FPP 731
28
6/2/15
FPP 732
H
Hold
Test Methods Utilized
Fracture Regular
I
Cylinders Made By: CP
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Remarks and/or Distribution:- None
cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.