ST0502A-LR150508G1 -GEOTECHNICAL ENGINEERING
E I -ENVIRONMENTAL CONSULTING
E I -CONSTRUCTION MATERIALS TESTING
GEE Consultants,
10046 Monroe Drive - Dallas, Texas 75229 - (214) 352-5433 - Fax (214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Measured
Slump (in.)
Report Date:
May 8, 2015
Date Concrete Placed: April 29, 2015
Standard 6"xl2" Cylinders
Client:
City of Coppell
Cylinder Cross-sectional Area: 28.27 Square Inches
Project:
Freeport Pkwy from Ruby Rd. to Sandy Lake Rd.
Concrete Report No.: 182
Contractor:
CD Builders
FPP 702
Project No.: 214-0144
Concrete Supplier and Plant:
Argos 110
Location of Placement:
Decel Lane North -bound STA 2+00 to 3+20, Bike Trail STA 1+60 to 2+60;
STA 12+00 to 15+50
MATERIALS
Source /
Description
SSD Batch Wts. OBSERVATION DATA
(Lbs/CuYd)
Mix Number:
1273
Time Sample Batched:
7:27 AM
Cement:
Time Sampled:
8:05 AM
Fly Ash:
Sample Location:
Decel Lane North -bound STA
Coarse Aggregate:
2+00 to 3+20, Bike Trail STA
Intermediate Aggregate:
ASTM C-31, C-39, C-143
1+60 to 2+60; STA 12+00 to
Fine Aggregate:
15+50
Admixtures:
Truck / Ticket No:
5017 /1605286
1
Temperature:
Ambient Range:
53 OF
2
Concrete Range:
66 OF
Added Water:
0
Slump Range (inches):
3.5
Weather Conditions:
Sunny
Time Started:
7:00 AM
Time Completed:
3:30 PM
Sample Air Content (%):
4.0
Total Cubic Yards Placed:
10
Rarntirarl Ctranrrth 11 the Ion ire 1•
'24AA
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compressive Strength
(Lbs./Sq.ln.)
Remarks
FPP 701
7
516/15
120,140+
4,250+
FPP 702
28
5/27/15
3.5
FPP 703
28
5/27/15
FPP 704
H
Hold
Test Methods Utilized
Fracture Regular
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Cylinders Made By: CP
Remarks and/or Distribution:- None
cc: Mr. Rick Odell - City of Coppell via E-mail: ROdell@coppelltx.gov
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.