Loading...
RE: Sandy Lake Bridge (3)Keith Thanks for forwarding the comment. I'll get with Tim tomorrow and respond. Thanks Chris Chris Schmitt, P.E. Principal  17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Main 903.421.1897 Mobile 214.461.9864 Fax cschmitt@tnpinc.com -----Original Message----- From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Thursday, October 02, 2014 7:04 PM To: Tim May; Chris Schmitt Cc: Rick Odell; John Elias Subject: Sandy Lake Bridge Gentlemen, We met with Tiseo and their bridge subcontractor today to discuss several issues regarding the bridge. One issue that they are concerned about is the decorative paving in the median. Some of their concerns are: 1. The potential movement of the bridge from flexing or expansion/contraction damaging the multiple pieces of different concrete called for in the plan. 2. There does not appear to be a pay item in the project for this decorative concrete. Any thoughts on either of these issues? Thanks. Keith Marvin City of Coppell