RE: you asked me to wait for resultsMr Harter asked me to wait for the final construction, trusting the city would live up to their word. The city issues; 1. narrowed 101 drive & did take cement drive without my permission, promising to restore entire entry 2. TAKING and removed frontage without permission, on Oak trail 3. did not repair sprinkler system as promised, which was tied to easement area ..now have major foundation movement by not have automatic system 4. did not live up to drainage plan on oak trail or sandy lake commitment I want in writing how Coppell Engineering plans to restore my property and if it is contact the city attorney, then place it in writing and I will ask for a civil suit to be brought to the city, and my attorney fees paid. Christina Lawson This message (including any attachments) is intended solely for the specific individual(s) or entity(ies) named above, and may contain legally privileged and confidential information. If you are not the intended recipient, please notify the sender immediately by replying to this message and then delete it. Any disclosure, copying, or distribution of this message, or the taking of any action based on it, by other than the intended recipient, is strictly prohibited. Thank you for your ethics. ________________________________ From: KMarvin@coppelltx.gov To: kinglp7@hotmail.com CC: kenharter@tx.rr.com; ddodd@njdhs.com Subject: RE: you asked me to wait for results Date: Thu, 14 Aug 2014 16:32:16 +0000 Ms. Lawson, All correspondence concerning your property and claims arising from the work on Sandy Lake Road has been forwarded to our City Attorney for review. Our attorney previously reached out to Mr. Harter to set up a meeting, but to my knowledge that meeting has not taken place. As long as Mr. Harter represents you in this matter, our attorney, David Dodd, will need to speak with him prior to making contact with you. I would like to reiterate my offer for the four of us to sit down and discuss your concerns and claims against the city. We would be happy to meet at the city offices at a time that is convenient for you and Mr. Harter. Keith Keith Marvin, P.E. Assistant Director of Public Works Engineering Department City of Coppell, TX www.coppelltx.gov <http://www.coppelltx.gov> 972-304-3681 (office) <http://www.coppelltx.gov/> <https://www.facebook.com/pages/City-of-Coppell-TX-Municipal-Government/ 324357528624> <https://twitter.com/CityofCoppell> <http://www.youtube.com/CityOfCoppellTX> <http://www.coppelltx.gov/ecocoppell-522.html> Please take our customer service survey <https://../../../../../Users/slogan/AppData/Local/Microsoft/Windows/Tem porary%20Internet%20Files/Content.Outlook/WTM9UJQI/customer%20service%20 survey%20URL> From: Christina Lawson [mailto:kinglp7@hotmail.com] Sent: Thursday, August 14, 2014 7:47 AM To: Keith Marvin Cc: Ken Harter, ATTY - DFW Subject: you asked me to wait for results Importance: High Keith, I was asked to wait until construction finished, so now 4 months later, since you have pictures, the following is at issue on 101 Oak Trail; 1. DRIVEWAY ENTRANCE TO OAK TRAIL AND SANDY LAKE; ESPECIALLY OAK TRAIL when taking land on driveway, the city contractors narrowed my entrance to oak trail, taking up my driveway cement to the narrow point and leaving less access, 2. SPRINKLER SYSTEM sprinkler system was not repaired as promised and caused my foundation to move (AUTO WATERING ALONG FOUNDATION), grass and plants to fail; 3. OAK TRAIL curbing to end of asphalt on Oak Trail to prevent water from cascading off of elevated oak trail into 101; 4. ACCESS access to Oak Trail, which we were told would not be limited, is now going to be cut off from Sandy Lake heading EAST, based on no opening in the median. 5. DRAIN on Sandy Lake which is adjacent to property has an engineering dip in the sidewalk which allows for back up drainage (overflow) to flow onto 101 Oak trail. this needs to be cured. 101 Oak Trail should not be considered a drainage overflow any longer for the city of coppell. Please send an official in writing response to the items listed above. No further verbal promises will be accepted for repair and intent of city of coppell engineering. Respectfully submitted Christina Lawson 101 Oak Trail Coppell Tx 75019 This message (including any attachments) is intended solely for the specific individual(s) or entity(ies) named above, and may contain legally privileged and confidential information. If you are not the intended recipient, please notify the sender immediately by replying to this message and then delete it. Any disclosure, copying, or distribution of this message, or the taking of any action based on it, by other than the intended recipient, is strictly prohibited. Thank you for your ethics.