Loading...
WA9302A-LR 960626 (2)G EOTECHNICAL E NGINEERING E NVIRONMENTAL GEE Consultants, inc. 10046 Monroe Drive · Dallas, Texas 75229 (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: MATERIALS Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Adm i xtures: 2 Added Water: June 26, 1996 Date Concrete Placed: May 31, 1996 City of Coppoll Village Parkway Pump Station Addition North Texas Municipal Construction Co., Inc. DFW Redimix, Inc. Piers B-3, C-3, SW-1, SW-2 So.,ce/ ha,oh w~. INSPECTION DATA Description (Lbs,/Cu. Yd) Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 3 0 Gallons Time Sample Batched: 11:10 am Time Sampled: 11:443 pm Sample Location: Piers B-3, C-3, SW-I, SW-2 Truck/Ticket No: 303/5731 Temperature: Ambient Range: 90°F Concrete Range: 80°F Slump Range (inches): 6" Weather Conditions: Cloudy Time Started: 7:30 am Time Completed: 1:30 pm Sample Air Content (%): 3~" Total Cubic Yards Placed: 10 C.Y. Required Strength (Lbs./sq.in.): 4,000 psi Specilnen Mcasured Age Date Number Slump (in.) (Days) Tested VPP 9 6" 7 06/07/96 VPP 10 6" 7 06/07/96 VPP 11 6" 28 06/28/96 VPP 12 6" 28 06/28/96 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted Oilierwise) Remarks and/or Distribution: Total Load Compressire Sirengrit (Lbs.) (Lbs./Sq.ht.) Reinarks 97,200 3,440 106,260 3,760 CylilxJers Made By: L,D. CO: Mr. Larry Davis - City of Coppell Mr. Mike Diagre - Norill Texas Municipal Construction Co. Mr. Gary Hendricks - Shimek, Jacobs aad Finklea Reviewed