Copperstone FS-CS 890331TO:
· _ CITY OF COPPELL
255 PARKWAY BLVD.
P. O. BOX 478
WE ARE SENDING YOU [ ~Attached [ ] Mark Up Plans
[ ] Copy of Minutes
[ ] Change order
[ ] Under Separate Cover via t~he following items:
[ ] Plans [ ] Prints
, etter Specmca,=ions
[ ]
COPIES DATE NO . DESCRIPTION
THESE ARE TRANSMITTED as checked below:
[ ] For Your Use
[ ] As Requested
[ ] For Review & Comment
[ ] Returned for Corrections
~ Resubmit ~'f~for Approval
[ ] Return Corrected Prints
RE~ARKS:
[ ] Approved as Noted
[ ] Approved as Submitted
[ ] Note & Reply To: "
[ ] Note & Forward To:
[ ] Submit Copies for Distribution
[ ] Return Markup Plans with Corrections
COPY TO:
SIGNED:
Federal Emergency Management Agency ~'c: Pocgdl
Washington, D.C. 20~72
FILE COPY
Mr. Jerry Parche', P.E.
Jerry parche' Consulting Enginee
320 Westway Place, 8uite 501~
Arlington, Texas 76018 /c~(~ ~' Z; , : '
RE: The February 24, 1989 letter from Mr. Russell R. Doyle, P.E., City Engineer
for the City of Coppell, to FEMA.
Dear llr. Parche':
This is in response to the above-mentioned letter requesting that the Federal
Emergency Management Agency (FEMA) determine the effects of a proposed flood
plain modification in the following community:
City of Coppell, Dallas County, Texas (Project: Parks of Coppell)
FEMA has initiated a reimbursement procedure to allow for the recovery of
costs associated with the review of such requests, thereby reducing the
expenses to the general taxpayer. Enclosed for your information is a copy of
Part 72 of the National Flood Insurance Program regulations, by which this
policy was implemented.
We are currently reviewing your request package to determine the appropriate
processing procedure. When this initial review is completed, we will inform
you of any fee or additional information that may be required to continue the
processing of your submittal.
Should you have any questions concerning this matter, please contact Matthew B.
Miller of our Headquarters staff in Washington, D.C., at (202) 646-34fi~.
Sincerely,
Chief, Risk Studies Division
Federal Insurance Administration
Enclosure
cc: Mr. Russell R. Doyle, P.E.
RECEIVE. O
HAR 3 0 1989
FEDERAL EMERGENCY MA~J~GEMENT AGENCY
National Flood Insurance Program
a_nd Related Regulations
Revised as cf October 1, 1986
Amendment No.1, June 30, 1987
PART 72--PROCEDURE AND FEES
FOR OBTAINING CONDITIONAL
APPROVAL OF MAP CHANGES
V2.1 Purpose of part.
72.2 Definitions.
72.3 Initial fee schedule.
72.4 Submittal/payment procedures and
FEMA response.
72.$W--xemptions.
?2.8Unfavorable response.
'/2.7 Resubmittals.
AUTHORZTY: 31 U.S.C. 9701:42 U.S.C. 4001
et seq,: Reorganization Plan No. 3 pt 1978:
le-.O. 12127.
E~URCE: 50 F~ 36028, Sept. 4, 1985. unless
otherwise noted.
~ 72.1 Purpose of part.
The purpose of this part is to pro-
vide administrative and cost recovery
procedures for engineering review and
processing a.~sociated with the issu-
ance of Conditional Lette~ of Map
Amendment (conditional LOMAs) and
Conditional Letters of Map Revision
(conditional LOMas). Pinal LOMAs
and LOMRs granted to correct map
deficiencies are not subject to this re-
imbursement procedure.
~ 72.2 l)efinilionn.
(al Except Rs otherwise provided in
this part. the definitions set forth in
Part 59 of this subchapter are applica-
ble to this part.
(b) For the purpose of this part. a
Conditional Letter of Map Amentl.
meat (conditional I.OMA) is FEMA's
comment on a proposed project to be
located in and affecting only that por.
Lion of thc area of special flood hazard
outside the regulatory floodway and
having no impact on the existing regu-
latory floodway or effective base flood
elevations.
(c) For the purpose.of this part. a
Conditional Letter of Map Revision
(conditional LOMR) will be F'EMA's
comment on a proposed proJect that
would affect the hydrologic and/or
hydraulic characteristics of a flooding
source and thus result in the modifica.
Lion of the existing regulatory flood-
way or effective base flood elevations.
§ 72.3 Initial fee .~hedule.
(a) For conditional Letters or Map
Amendment. the initial fee shall be
paid by the requestor in the followinR
amounts:
( 1 ) 81hale-lot ............................................. $125
(2) Mu Itl- lot/subdivision ........................ 1175
(b) For conditional Letters of Map
Revision, the initial fee shall be paid
by the requestor In the following
amounL~:
(!~ New bridRe or culvert {no ch~n-
neli~Uon) .............................................. ~150
(2) Cha~mel medfflcatio~_s only ............ $400
(3) Channel modilkatton and new
bridRe or culvert ................................... $$~
(4) Levees. berms, or other stfl~ctur.
al mettxu res ............................................ $875
(c) For projects involving combina-
Lions of the above actions which are
not separately identified, the initial
fee shall be that charged for the most
expensive of the actions comprising
the combination.
172.1 Submittal/payment procedures and
FEMA response.
(a) Initial fees shall be submitted
with the request for FEMA review and
processing of conditional LOMAs and
conditional LOMI~.
(b) Initial fees must be received by
FEMA beIore the review can be In(ti-
ated for any conditional LOMA or con-
ditional LOMR request.
(c) Following completion of FEMA
review for any conditional LOMA or
conditional LOMR. the requestor will
be billed at the prevailing private
sector labor rate (currently $25.00 per
hour) for any actual cost~ exceeding
the initial fee incurred during the
review.
(1) Requestors of conditional
LOMAs will be notified of the antici-
pated total cost if the total cost of
processing their request will exceed
$500.
(2) Requestors of conditional
LOMRs will be notified of the antici-
pated total cost if the total cost of
processing their request will exceed
$1,500.
(3) In the event that processing costs
exceed the limits defined in para-
graphs (el(l) and (2) of this section.
processing of the request will be sus-
pended pending FEMA receipt of writ.
ten approval from the requestor to
proceed.
(d) The entity that applies to FEMA
through the local community for
review will be billed for the cost of the
review. The local community incurs no
financial obligation under the reim-
bursement procedure set forth in this
part u a result of transmitting /he
submittal to FEMA.
(el Payment of both the initial fee
and final cost shall be by check or
money order payable to the United
States Treuury and must be received
by FEMA before the conditional
IX)MA or conditional LOMR will be
Issued.
if) For conditional LOMA requests,
~ shall:
(1) Notify the requestor within 30
days as to the adequacy of the submit-
tal. and
(2) Within 30 days of receipt of ade-
quate information, provide comment
to the requestor on the proposed
project.
cg) For conditional LC)MR requests,
FEMA shall:
(1) Notify the requestor within 60
days a~ to the adequacy of the submit..
tel. and
(2) Within 90 days of receipt of nde.
quate information, provide comment
to the requestor on the proposed
project.
! 72.5 Exemptions.
Federal, State. az~d loc~! govern-
merits ~nd their a~encles shall be
exempt from fees for projects they
sponsor if the requestor certifies that
the particular project is for public
benefit and primarily intended for
flood loss reduction to existing devel-
opment in identified flood hazard
areas, as opposed to planned flood
plain development.
§72.6 Unfavorable response.
A conditional LOMA or conditional
LOMR may be denied or may contain
specific comments, concerns, or condi-
tions regarding a proposed project or
design and its impact~ on flood haz-
arch in a community. A requestor is
not entitled to any refund if the letter
contains such comments, concerns, or
conditions, or if the letter is denied. A
requestor is not entitled to any refund
if the requestor is unable to obtain re-
quired authorizations, permits, financ-
ing, etc,, for which the letter was
sought.
§72.7 Resubmittals.
Any resubmittal of a request more
than 90 days after FEMA notification
that a request has been denied or after
a review has been terminated due to
insufficient information or other rea-
sons will be treated as an original sub-
mission and subject to all submittal/
payment procedures as described in
~ 72.4, including the initial fee. The
procedure of ~ 72.4 including the ina-
Ual fee, will also apply if the project
has been si~niflc~.ntly altered in
design or scope other than that neces-
sary to respond to previously issued
comments, concerns, or conditions by
FEMA.