Loading...
WA9302A-LR 960626 (4)G EOTECHNICAL E NGINEERING E NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Projecl: Coiltractor: Coilcrete Supplier and Plant: Location of Placement: MATERIALS Mix Number: Cement: Fly Ash: Coarse Aggregate: Iutermediate Aggregate: FiDe Aggregate: Admixtures: | 2 Added Water: June 26, 1996 Date Concrete Placed:. May 30, 1996 City of Coppell Village Parkway Pump Station Addition North Texas Municipal Construction Co., Inc. DFW Redimix, Inc. Piers C-I, A-2, B-2, C-2 Son~e, .a,~,, w~. INSPECTION DATA Description (Lbs JCu. Yd) Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 2 6.5 Sack Time Sample Batched: 12:50 pm Time Sampled: 1:30 pm Sample Location: Piers C-l, A-2, B-2, C-2 Truck/Ticket No: 302/5964 Temperature: Ambient Range: 100°F Concrete Range: 90°F Slump Range (inches): 4~h" Weather Conditions: Sunny Time Started: 7:30 am Time Completed: 5:00 pm 5 Gallons Sample Air Content (%): Total Cubic Yards Placed: 10 C.Y. Required Strength (Lbs./sq.in.): 4,000 psi specimen Measured Age Date Number Shmtp (in.) (Days) Tested VPP 5 41/," 7 06/06/96 VPP 6 4 IA" 7 06/06/96 VPP 7 4 ¼" 28 06/27/96 VPP 8 4V:" 28 06/27/96 Test Metlmds Utilized Fracture Regular ASTM C-31.C-39,C-143 (Unless N~Ced Otherwise) Remarks aM/or Distribution: Tolal Load C~npress~e Sl~ng~ (Lbs.) (Lbs./~.In.) 114,020 4,030 116,160 4,110 Cyli~x:lers Made By: L.D. R~narks CC: Mr. Larry Davis - City of Coppell Mr. Mike Diagre - North Texas Municipal Construction Co. Mr. Gary Hendricks - Shimek, Jacobs and Finklea Xeviewed by x