Freeport NIP(7.5)-CS010424 T H E C I T Y 0 F
CO?PEIjI
April 24, 2001
David Husted
Butler Construction
15100 Trinity Blvd, Ste 100
Fort Worth, Texas 76155
Fax # 817/267-1902
RE: Duke-Freeport Addition, Lot 4 & 4X, Block A (Freeport IX)
Dear David:
A pre-construction conference on the referenced project has been scheduled for Friday, April 27,
2001 at 9:00 a.m., in the second floor conference room in Town Center at 255 Parkway Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any
other interested parties so that they may have a representative present.
If you should have any questions concerning this project, please feel free to call me at (972) 304-
3684.
Construction Inspector
CC:
Mike Martin, P.E. Asst. City Engineer
Glenn Hollowell, Asst. Director of Pub
Greg Jones, Chief Building Official
Lee Stone, Commercial Inspector
Travis Crump, Fire Marshal
I#o! b
Post-it' Fax Note 7671 °ate~124l O~ Ipages J
To iqg-
Co./Dept. Co.
3hone ~
=hone ~
I#of ·
Post-it' Fax Note 7671 Oat~l'l~,~-/0 ~ IPages- ~
T°DA~) ~'~'~S~ From~_~il~,J,~ p~l~..S
Co./Dept. Co. /
Phone ~ Phone ~
Date # o!
Post-it* Fax Note 7671
TO ~L~-~ N From
Co./Dept.
Phone ~ Phone
F~ ~ F~