Devonshire 1-CS 901211 CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
DEVONSHIRE ADDITION - FINAL PLAT
? & Z HEARING DATE: December 11, 1990
C. C. HEARING DATE: January 8, 1991
LOCATION: Approximately 1,433 feet south of Sandy Lake Road, along
the east side of Coppell Road.
SIZE OF AREA: 28.49 Acres
REQUEST: Approval of a final plat of the Devonshire Estates Addition.
APPLICANT: Gee Development Mr. Brad Meyer
1901 Stadium Oaks Drive Carter & Burgess
Arlington, Texas 76011 7950 Elmbrook Drive, Ste 250
Dallas, Texas 75247
(214) 638-0145
HISTORY: Zoning Case #ZC-528 and the preliminary plat for
Devonshire Estates Addition have been approved by the
Planning and Zoning Commission and City Council with
certain conditions which are as follows:
1) reduce lot count from 104 to 102
2) minimum lot size = 7260 square feet (typically 66' X
110')
3) average lot size = 8800 square feet
4) lots 6, 7, 20, 21, 34, 35 and 49-58 = 1 or 2 story, not
less than 2300 square feet air-conditioned space, lots
59-65 = 1 story, minimum 2300 square feet
air-conditioned space
5) no alley on east property line
6) developer volunteered screening fence on those lots
without one on cul-de-sac's bordering the southern
property line
7) not more than 35% of remaining lots (28 lots) will
contain houses of not less than 2000 square feet
air-conditioned space; remainder of lots to contain
minimum 2300 square feet air-conditioned space
8) screening fence and landscaping (to be maintained by
Home Owners Association) along Coppell Road
TRANSPORTATION:
Coppell Road in its present state is a two-lane, undivided
substandard roadway, which will be improved in the future
to accommodate four lanes of traffic along the western
boundary of the property. As a normal requirement of
platting a parcel of land along a substandard road, the
developer will be required to place in escrow $72,990.00
for future improvements to Coppell Road.
ANALYSIS: Any condition or agreement that is not written on the final
plat has already been addressed, and is reflected on the
exhibit. All other agreements are indicated on the face of
the plat and will be addressed during the building permit
approval process.
ALTERNATIVES: 1) Approve the final plat
2) Deny the final plat
ATTACHMENTS: 1) Final Plat
DEVFSTF