Sandy Lake Revised Bridge Pier PlansKeith
Here are the remaining revised sheets from Delvin. I believe this is
everything.
FYI, we are getting real close to having a submittal set ready for HWY
121 as well. You should likely have something early to mid-week.
Thanks.
Casey McBroom, P.E.
Project Engineer
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com <mailto:cmcbroom@tnpinc.com>