Loading...
RE: Tiseo Paving (2)Keith I’ve just cleaned up a bid tab for all the contractors who submitted a bid. Every one of them had some form of error within which I’ve summarized in the first tab of the spreadsheet, with 2A and 2B itemized on the next tabs. Anything incorrect was highlighted in yellow. It also seems like we were given the originals of the Haydon submittal by mistake, instead of the copies. I can return these the next time I’m in the area. Take a look at everything, and let us know your thoughts. Thanks. Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Tuesday, April 30, 2013 5:29 PM To: Casey McBroom Subject: RE: Tiseo Paving Thanks Casey. Any errors in the other ones? Keith Marvin, P.E. City of Coppell 972-304-3681 From: Casey McBroom [mailto:CMcBroom@TNPINC.com] Sent: Tuesday, April 30, 2013 3:41 PM To: Keith Marvin Cc: Chris Schmitt Subject: Tiseo Paving Keith I just finished checking all of the quantities, and it appears the landscaping was the only item they messed up. At about the same time I was finishing, Shane called to let me know of the error, and asked what he needs to do. Their new base bid should be $8,633,084.52, a difference of $153,000.00. I told him I’d follow up with him on how he should proceed at this point once I’ve heard back from you. I’m still checking the other bid unit prices. Thanks. Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com <mailto:cmcbroom@tnpinc.com>