Loading...
FW: CPL Registration Form and SubmittalKeith Here is the TDLR form that Andrew filled out for Bob Davies. Let me know if you have any questions. Design speed was 40 mph. Thanks. Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com From: Andrew Luce Sent: Friday, April 26, 2013 2:56 PM To: Casey McBroom Subject: FW: CPL Registration Form and Submittal Casey, Here are the completed TDLR forms. The file called “Project Registration” gives the fees based on construction cost. I have the construction cost listed as $223,165. This total is based on the estimated cost of bid items related to sidewalk, trail, pedestrian ramps, pedestrian rail, pedestrian signal heads, and pedestrian push buttons. These are bid items I-23,I-24, I-31:I-35, I-41, I-142, I-143 Also, the design speed I used for Sandy Lake Phase 2B was 40 mph. Let me know if you have any questions. Thanks, Andrew From: Andrew Luce Sent: Friday, April 05, 2013 2:36 PM To: Chris Schmitt; Casey McBroom Subject: FW: CPL Registration Form and Submittal Attached are the completed TDLR forms. Do either of you know if we submit the forms with a check and we bill the City later, or do we request a check directly from the City to give to Bob? Thanks, Andrew From: Sam Knight Sent: Friday, April 05, 2013 2:22 PM To: Andrew Luce Subject: CPL Registration Form and Submittal Samuel P. Knight E.I.T. Graduate Engineer 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7148 Direct 817.896.8580 Mobile 817.336.2813 Fax sknight@tnpinc.com <mailto:sknight@tnpinc.com>