Loading...
Sandy Lake - Addendum No. 1 DRAFTKeith Attached is the draft for the first addendum to Sandy Lake. We are still trying to determine an ideal PI number with regards to embankment, and Robert Jenkins had some final questions regarding the last city review that I’ve attached as well. We would also like to include as many comments from Rick as possible on this addendum. I was thinking of sending this out tomorrow afternoon if possible, but I’ll wait to hear from you first. Thanks. Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com