Sandy Lake - Addendum No. 1 DRAFTKeith
Attached is the draft for the first addendum to Sandy Lake.
We are still trying to determine an ideal PI number with regards to
embankment, and Robert Jenkins had some final questions regarding the
last city review that I’ve attached as well.
We would also like to include as many comments from Rick as possible on
this addendum. I was thinking of sending this out tomorrow afternoon if
possible, but I’ll wait to hear from you first.
Thanks.
Casey McBroom, P.E.
Project Engineer
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com