Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
DFW Trade JV-LR 990323 (2)
'~..~i TRINITY I~NGINEERING TESTING CORPORATION P.O. BOX 223571, DALLAS, TEXAS 75222-3571 /'~:. ......... ~..~ STRAIGHT SHAFT PIER REPORT TO: INDUSTRIAL DEV INTERNATIONAL PROJECT: DFW TRADE CENTER 5420 LBJ FRWY, SUITE 1275 BUILDING H DALLAS, TX 75240 TETCO NO.: 3126 Date: 3/23/99 Technician: J. TIPTON Report No: 399832 IDENTIFICATION MARK B.7-0.1 C.2-0.1 F-1 SHAFT DIAMETER PLAN/ACTUAL 36" 36" 36" TOP OF PIER ELEVATION * 486.7 486.2 485.5 DEPTH TO PRIMARY 18.4' 18.8' 25.9' TOTAL DEPTH OF PIER 21.4' 22.0' 29.0' PRIMARY PENETRATION PLAN/ACTUAL 3.0' 3.2' 3.1' DEPTH AND 19.33' DIAMETER OF CASING NA NA 36" STEEL CAGE LENGTH 18.2' 18.8' 25.4' DATE/TIME 3/23/99 3/23/99 3/23/99 DRILLING COMPLETED 2:30 PM 3:15 PM 4:20 PM PLUMBNESS VARIATION WITHIN WITHIN WITHIN TOLERANCE TOLERANCE TOLERANCE CONDITION OF PIER BEFORE CONCRETE GOOD GOOD GOOD DATE/TIME 3/23/99 3/23/99 3/23/99 CONCRETE PLACEMENT 3:00 PM 4:00 PM 4:50 PM Remarks: * TOP OF PIER ELEVATION OBTAINED FROM THE CONSTRUCTION PLANS. REPORTS TO: 1-CLIENT, ATT: KEN KUESEL 1-KAJIMA CONST 1-COMPASS BANK TRINITY ENGINEERING TESTING CORP. 1-MacGREGOR ASSOC. ARCHITECTS ,~ ,~~~ .~ 1-POTTER CONCRETE CO. 1-PIONEER CONCRETE 1-CITY OF GRAPEVINE '~-[./ Roy R. Grant, P.E. 1-CITY OF COPPELL