Loading...
DFW Trade JV-LR 990323 TRINITY =NGINEERING TESTING CORFORATION  P.O. BOX 223571, DALLAS, TEXAS 75222-3571 STRAIGHT SHAFT PIER REPORT TO: INDUSTRIAL DEV INTERNATIONAL PROJECT: DFW TRADE CENTER 5420 LBJ FRWY, SUITE 1275 BUILDING H DALLAS, TX 75240 TETCO NO.: 3126 Date: 3/23/99 Technician: J. TIPTON Report No: 399832 IDENTIFICATION MARK E-15 F-21 D-15 A-3 AA-0.1 A.6-0.1 SHAFT DIAMETER PLAN/ACTUAL 48" 36" 48" 36" 36" 36" TOP OF PIER ELEVATION * 482.5 482.5 482.5 485.5 486.2 486.2 DEPTH TO PRIMARY 10.0' 14.0' 10.2' 20.4' 20.4' 20.0' TOTAL DEPTH OF PIER 20.2' 17.1' 20.5' 23.4' 23.6' 23.1' PRIMARY PENETRATION PLAN/ACTUAL 10.2' 3.1' 10.3' 3.0' 3.2' 3.1' DEPTH AND DIAMETER OF CASING NA NA NA NA NA NA STEEL CAGE LENGTH 14.2' 9.6' 14.5' 19.4' 20.7' 20.4' DATE/TIME 3/23/99 3/23/99 3/23/99 3/23/99 3/23199 3~23~99 DRILLING COMPLETED 8:10 AM 9:10 AM 10:30 AM 11:40 AM 1:00 PM 1:50 PM PLUMBNESS VARIATION WITHIN WITHIN WITHIN WITHIN WITHIN WITHIN TOLERANCE TOLERANCE TOLERANCE TOLERANCE TOLERANCE TOLERANCE CONDITION OF PIER BEFORE CONCRETE GOOD GOOD GOOD GOOD GOOD GOOD DATE/TIME 3/23/99 3/23/99 3/23/99 3/23/99 3/23/99 3~23~99 CONCRETE PLACEMENT 11:00 AM 11:30 AM 12:00 PM 12:30 PM 2:00 PM 2:30 PM Remarks: * TOP OF PIER ELEVATION OBTAINED FROM THE CONSTRUCTION PLANS. REPORTS TO: l-CLIENT, ATT: KEN KUESEL I-KAJIMA CONST 1-COMPASS BANK TRINITY ENGINEERING TESTING CORP. 1-MacGREGOR ASSOC. ARCHITECTS 1-POTTER CONCRETE CO. 1-PIONEER CONCRETE 1-CITY OF GRAPEVINE / Roy R. Grant, P.E. l-CITY OF COPPELL 330