Loading...
WA9302A-LR 960626 (5)G EOTECH N ICAL E NGINEERING E NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: MATERIALS Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 1 2 Added Water: June 26, 1996 Date Concrete Placed: May 29, 1996 City of Coppell Village Parkway Pump Station Addition North Texas Municipal Construction Co., Inc. DFW Redimix, Inc. Piers A-l, B-1 so~e/ B~.h Wt~. Description (Lbs./Cu. Vd) INSPECTION DATA Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: I 6.5 Sack Time Sample Batched: 1:10 pm Time Sampled: 1:45 pm Sample Location: Piers A-I, B-1 Truck/Ticket No: 302/5959 Temperature: Ambient Range: 98°F Concrete Range: 85°F Slump Range (inches): 5 th" Weather Conditions: Sunny Time Started: 7:30 am Time Completed: 3:30 pm 0 Gallons Sample Air Content (%): 31,~" Total Cubic Yards Placed: 10 C.Y. Required Strength (Lbs./sq.in.): 4,000 psi Specimen Measured Age Number Slump (in.) (Days) VPP 1 51/2" 7 VPP 2 5 t/: ,, 7 VPP 3 51/2" 28 VPP 4 5 V2" 28 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 Remarks and/or Distribution: Daic Toud Load Compressivc Sireugh T~ a-~.) (t~./sq.ln.) 06/05/96 86,420 3,060 06/05/96 97,080 3,430 06/26/96 06/26/96 (Unless ~ Otherwise) Cylinders Made By: L.D. Remarks Co: Mr. Larry Davis - City of Coppell Mr. Mike Diagre - North Texas Municipal Construction Co. Mr. Gary Hendricks - Shimek, Jacobs and Finklea