Devonshire 2-CS 930920 P.O. Box 478
Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
September 20, 1993
Mr. Steve Gee
G Development Group
8445 Freeport, Suite 210, LB #46
Irving, Texas 75063
RE: Devonshire Addition - Phase II
Maintenance Bond Walk Through
Mr. Gee:
Attached is a copy of the punch list for the above referenced
project performed by Public Works staff on September 20, 1993. As
you know the termination date for the bond is September 25,1993;
therefore, I am providing you this notice.
Please ensure that the contractor, L.H. Lacy, is made aware of
the deficiencies in this subdivision.
Please contact my office with an anticipated schedule for these
repairs.
~tYr e~e~uap~erS i-nt endent
RG/rg
cc: Steven G. Goram, Director of Public Works
Ken Griffin, City Engineer
Larry Davis, Construction Inspector
C~TY OF COPPELL
BOND W~K THROUGH
DEVONSHIRE PHASE ~
SEPTEHBER 20~ L993
1. RANDOM CRACKS; 135 NEWPORT AND 139 NEWPORT
2. ALLEYS AND STREETS NEED TO BE CLEANED FOR BETTER INSPECTION
3. RANDOM CRACKS IN ALLEY BEHIND 175 NEWPORT, 155 NEWPORT, AND
420 HALIFAX
4. CORNER OF ALLEY PANEL @ T OF NEWPORT AND CARRINGTON
5. CONSTRUCTION DEBRIS/TRASH ON BOTH THE NORTH AND SOUTH
BOUNDARIES
RG/rg
DEVONWT.RG