Loading...
WA9302A-LR 960626 (6)G EOTECH N ICAL E NGINEERING E NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: MATERIALS Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: | 2 Added Water: June 26, 1996 Date Concrete Placed: May 29, 1996 City of Coppell Village Parkway Pump Station Addition North Texas Municipal Construction Co., Inc. DFW Redimix, Inc. Piers A-l, B-I S,,.rce, .a,c,, w~, INSPECTION DATA Description (Lbs./Cu. Yd) 6.5 Sack Time Sample Batched: 1: 10 pm Time Sampled: 1:45 pm Stunpie Location: Piers A-I, B-1 Truck/Ticket No: 302/5959 Temperature: Ambient Range: 98°F Concrete Range: 85 °F Slump Range (inches): 5%" Weather Conditions: Sunny Time Started: 7:30 am Time Completed: 3:30 pm 0 Gallons Sample Air Content (%): 3~h" Total Cubic Yards Placed: 10 C.Y. Required Strength (Lbs./sq.in.): 4,000 psi Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: I Specimen Measured Age Date Number Slump (in.) (Days) Tcsled VPP 1 5 V2" 7 06/05/96 VPP 2 5 ~" 7 06/05/96 VPP 3 5 %" 28 06/26/96 VPP 4 5 V2" 28 06/26/96 Test Methods Utilized Fracture Regular ASTM C-31 .C-39. C- 143 (Unless Noted Otherwise) Remarks and/or Distribution: Total Load Compresslye Strengdu (Lbs.) (Lbs./Sq,ln.) 86,420 3,060 97,080 3,430 Cylinders Made By: L,D. Remarks CC: Mr. Larry Davis - City of Coppell Mr. Mike Diagre - North Texas Municipal Construction Co. Mr. Gary Hendricks - Shimek, Jacobs and Finklea Reviewed