Loading...
Devonshire 2-CS 920925.,' : ~' /i~-~--~..:~'~=?.,'~:~ /~' /~ ~ "=-7,1 //:::---/i:----:.. ./'_-er--~,'..~l~-.I--=~ P.O. Box 478 ~I /~'- ~'"'---' ~ " ...... -""" ......... ~" .......... ' September 25, 1992 Mr. Steve Gee G Development Group 8445 Freeport, Suite 210, LB//46 Irving, Texas 75063 RE: DEVONSHIRE ADDITION - PHASE II Dear Mr. Gee: A final inspection of the above referenced project has been confirmed by representatives of the City of Coppell subject to various maintenance agreements. The drainage utility and paving has been verified and is in compliance with the City of Coppell standard requirements. Erosion protection will also be maintained until bond expiration. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter (September 25, 1993). Maturity on the Erosion Control Bond will be two years from this letter (September 25, 1994). Sincerely, : ~ ~ / Larr~ Davis Construction InsI~ctor LD/lsg xc: Steve Ooram, Director of Public Works Kenneth M. Griffin, P.E., City Engineer M. Shohre Daneshmand, P.E., Civil Engineer Oreg ;;ones, Acting Building Official Bill Jones, L.H. Lacy Company Darrell Fagile, Wright Construction Comt my devon.ld