Loading...
Devonshire 2-CS 920916 G DEVELOPrilEn ,, inc. 8445 Freeport Pkwy. · Suite210, LB#46 · Irving, Texas 75063 ° (214)621-0059 ° FAX (214)9294744 September 16, 1992 Mr. Ken Griffin, P.E Coppell City Engineer 255 Parkway Blvd. C:~ppe].i, T~.xas 75019 Re: Devonshire Phase II Addition, City of Coppell. Dear Mr. Griffin, The construction of the improvements for Devonshire Phase II is now complete. This includes the improvements to the ditch along Coppell Road and the ditch on our south boundary. We have also installed siltation control devices through out the subdivision and enclosed is a check for $1,747.50 to cover the two year maintenance escrow. With the subdivision complete we request a City Acceptance and a full release for building permits for the balance of Devonshire lots not previously released. If we can provide any additional information please feel free to call. Sincerely, Steve Gee G Development Inc. cc: Mr. Larry Davis Mr. Donny Evans City Inspector Pulte Homes of Texas City of Coppell 1431 Greenway Dr., Suite 700 255 Parkway Blvd. Irving, Texas 75038 Coppell, Texas 75019 Mr. Brad Meyer Carter & Burgess Engineering 7950 Elmbrooke Dr., Suite 250 Dallas, Texas 75247 citycopp.ll G DEVELOPITIEn ., inc. 8445 Freeport Pkwy. · Suite 210, LB #46 · Irving, Texas 75063 · (214) 621-0059 · FAX (2141 929-4744 EROSION CONTROL COST FOR DEVONSHIRE, PHASE II COPPELL, TEXAS ITEM UNIT AMOUNT PRICE TOTAL HAY BALE CHECK DAM EA 150 $3.25 $487.50 SILT FENCE (36 ") LF 1200 $1.05 $1,260.00 TOTAL $1,747.50