WA9302A-CS 960820SHIMEK, JACOBS & FINKLEA CONSTRUCTION REPORT Project No. Date: 08/20/96 Prepared ~f!p ~ Is This A By: Matt Hickey Working Day? Owner: City of Coppell Project Name: Village Parkway Pump Station Addition Construction Contractor: North Texas Municipal Construction Co., Inc Time Allotted: 360 Used: 187 Number Superintendent: Bill Bigham. Men Working: 10+ Hours: 9:00 am to 9:30 am Weather Conditions: Clear and Hot Site Conditions: The site was in good condition WORK DESCRIPTION 1. Concrete was being poured on the southeast side of the pump station addition for the proposed driveway. 2. The water sampler valve outside of Vault No. 1 was being moved inside the vault. 3. The ammonia and chlorine buildings are on site. 4. The brick mason was completing some touch-up work inside the pump station addition. 5. Shingles were being placed onto the existing pump station and the pump station addition. 6. Larry Davis showed concerns about the installation of the exterior door on the pump station addition and the access into the existing pump station. Michael Daigre of NTMCC indicated the door will be installed on August 21, 1996. cc: Noah Texas Municipal Construction Co.