DFW Trade JV-CS 970305Mar-06-97 08:3gA Grap in~ Public Works 81 ~81 036g P.O1 ~ ¢.~ MarchS, 1997 Mr. Robert Marshall 6~i Bridge Strut, Suite Fo~ Worth, TX 76112 Fax (817) 446-3116 Re: Review of time Construction Plans for Patriot l)rive (Received 02/21/97) Dear Mr. Marshall: The City has reviewed your initial construction plans submittal for the above referenced project, The staff comments are al[ached. The attached review comments need to be addressed prior to "Rclc,l~ (br Construction". When the necessary revisions have been made please submit the following: 1. One (1) set of revised construction plans for final review. After the revised construction plans have been reviewed and approved, it will be time to arrange a pre. construction meeting. The plans will be "Released for Construction" a~ the preconstmction meeting. Please submit the following prior to the preconstruction meeting: 1. Five (5) copies oF the approved construction plans. The General Contractor/Owner needs to contact Mr. Scott Dycr, Senior Civil Engineer, to "set up" a preconsm~ction meeting. Two sets of plans stampext "Released for Construction" will be issued to the Contractor(s) at this meeting. If thc contractor(s) needs more than two ~ts of plans, then submit additional sets to be stamped. It is encouraged to have the Owner or his agent attend the Prcconstmction Meeting. "Final Acceptance" requirements pertaining to the Owner/Contractor's responsibilities are reviewed at this meeting. *'tJ~l_lC WC)T~.K$ E)EPT I>.C). Bo× c.):,lO~ * (.;roi.,~.,vin:'.-Fex,,: 76099 - Phon,: Mett-o $t7/481-0372 · F~sx 817/481 Mar-D6-97 08:39A Grape~ine Public Works 817~481 0369 P.02 Goodwin & Marshall March 5, 1997 If you have any questions concerning the above comments, do not hesilate to call me. Sincerely, ......... Scott A. Dyer, P.E. Senior Civil Engineer cc: Construction File Mr. Doug Johnson, IDI Tcxas District Office, 5420 LBJ Freeway, Suite 1275, DaUas, TX 752~,0 John Robcrtson, Drainage Coordinator Ken Griffin, City of Coppell, Fax: (972) O:\K~llie\plans97\Patriot. Rv I Mar-06-97 08:39A Grap~ine Public Works 81~481 0369 P.03 Con. ruction Pinata l~at riot Drive March 5, 1997 GENERAL COMMENTS * The Final Plat needs to forwarded to our oflice for signatures anti filed prior to thc release of construction plans, SHEETS 1 & 2, FINAl, PLAT * Add easements per comments on Buildings D and E prior to submitting plat to the City. SHEET 3, PAVING PLAN & PROFILE * Add paving station info for thc center of each inlet. Specify inlet size (minimum of 10'). Show grade break on the profile for the left and the right side~ of Patriot Drive at the intersection with Patriot. Relocate the manhole at sta 7+00 (Re: comments on sheet. 21). SHEET 4, PAVING PLAN &PROFILE * Add paving station info for the center of each inlet. Specify inlet size (minimum of 10'). * Show the manhole at sta 8+94. SIIEET 5, PAVING PLAN & PROFILE Add paving station info for the center of each inlet. Specify inlet size (minimum of 10'). Enlarge the inside radius at the corner (sta 21 +00) to a 30' minimum. Revise the outside radius to incoq)orate a knuckle. Mar-06-97 08:39A Grap(~ine Public Works 817~481 0369 P.04 Con.struction Plans Patriot Drive March $, 1997 SHEET 6, PAVING PLAN & PROFILE * Add paving station info for the center of each inlet. Specify inlet size (minimum of lo'). * Show the approximate location of the fi~ture Trade Center Drive. Delete the water line beyond this lx~int. The water line is to be looped back to Freeport Parkway via Trade Center Drive. (Re: comments on sheet 20). SHEET 7, PAVING PLAN & PROFILE Add 3000 psi to General Note #5. SIIEET 8, FREEPORT PARKWAY MEDIAN MODIFICATIONS Relocate the proposed 3' wide median (N. of Patriot) to the centerline of Freeport Parkway to divide north and south tnlffic on Freeport Parkway. * Revise the note to specify paint (not thermoplastic) per TXDOT specs. Revise mil thickness specification. SHEET 9. FREEPORT PARKWAY MEDIAN MODIFICATIONS * Revise the barrier-free ramp per thc sketch forwarded with the Buildings D and E review comments. SHEET 10, DRAINAGE AREA MAP * Add flow arrows for the portion of Building H adjacent to Freeport Parkway. Show this area to draining to the Freelx, rt Parkway systcm. * A meeting has been scheduled tbr Thursday, March 6, 1997 between myself and Goodwin & Marshall to discuss the following issues: 1. Provisions for the existing drainage prior to the construction of Buildings F, G, H , and I. Mar-06-97 08:40A Grap~in~ Public Works 817~481 0369 P.05 Cor~tructitm Plans Patriot Drive March 5, 1997 2. Future drainage design for Buildings F, G , H , and I, and Trade Center Drive. Note: Review of the system proposed on sheets 10 - 16 will be discussed at this meeting. SHEET 17, 12" WATERLINE * Show a 12" x 12" tee and gate valve with a 12" stub to the common property line of Lots 1 & 2, Block 4. (Approx sta 6+ 15). * Show a 12" x 2" tapping sleeve and valve with a 2" stub to l.ot 1, Block 4. (Approx sta 5 +50). * Show a 12" x 4" tapping sleeve and valve with a 4" stub to Lot 2, Block 4. (Approx sta 6+55). This line can be reduced to 2-1/2" at the property line. Note: Buildings D anti E will require separate irrigation meters. BuiMing E couM,~eed from the. 4' Hne. Erasure the 2, stub is adequate for buiMing and irrigation uxe.¥.[br BMMing D. Note: No laterals' are shown to be stubbed from the inlets tm storm drain line Am You may wish to deepen lateral A-] inorder to stub storm drain under the water line at a later date. SIIEET 18, 12" WATERLINE * Show all storm drain crossings. Specifically laterals B-I and B-3 wilh flowlines of 471.31' and 474.61' respectively. The water line will need to be lowered at both locations. SlIEET 19, 12" WATERLINE Show the 48" RCP, Lateral C-l, al approx sta 27+62. Flowline 467.95'. Waterline will have to be lowered. Locate fire hydrant and 12" valve beyond bends. 5 Mar-06-97 08:40A Grap~ine Public Works 817~481 0369 P.06 ConMructJo~ Plans Patriot ])rive March 5, 1997 SHEET 20, 12" WATERLINE * Show the 36" RCP, Lateral C-2, at approx sta 32+24. Flowline 472.45'. Waterline will have to be lowered. * Show the 42" RCP, Lateral C-3, at approx sta 33+80. Flowlil]e 474.50'. Waterline will have to be lowered. * End the waterline at approx sta 34+00 - 35+00 for future extension in Trade (:enter Drive. Show which side of Trade Center Drive the water line will be extended on. l_x)cate a tire hydrant near the end of line to act as a blOw-off. SIIEET 21, 8" SANITARY SEWER * Dimension sower to centerline. * Relocate the manhole at sta 5 +95 to be in front of Lot 2, Block 4. Show the 6" stub to Lot 2 and specify flowline at property line. * Show the 6" stub to Lot. I and specify tlowline at property line (sta 3+00). SIIEET 22, 8" SANITARY SEWER * Dimension sewer to centcrline. * Show 6" stub to Lot 2 and specify flowline at property line from the manhole at sta 12+89. Also show a second 6" stub to the unpIatted property and specify the flowline at the property line. SHEET 23, WATER & SANITARY SEWER DETAII~$ * No comments. SHEET 24, EROSION CONTROL DETAI * No COll'll]lentS. 6 Mar-06-97 08:40A Grap~_vin~ Public Works 817~481 0369 P.07 Co~trtm¢fion _Plans Patriot Drive lV~reh 5, i997 SIIEET 25, STREET LIGIIT LAYOUT PLAN Specify 250 watt bulbs. SHEET 26, PAVEMENT STRIPING & SIGNAGE PI, AN * Specify paint not thermoplastic for the pavement markings (per TXDOT paint specs), include revised mil thickness. MISCELLANEOUS COMMENTS * The City of Grapevine's Code of Ordinances shall be adhered to. Special attention should be given to Appendix F, Erosion anti Sedimentation Control. Section F of this ordinance allows the Director of Public Works to issue a "Stop-work order" for any development, improvement, or construction which is in violation of this ordinance. * The developer/owner will be charged a 5% Design Review and Construction Inspection Fee for water, sanitary sewer, drainage and paving improvements within public right-of-way or easements based on actual Construction costs. This fee is due prior to thc City's final acceptance of the public improvements. Construction Contracts are required to he submitted to the City of Grapevine to verify Construction COSTS. Each contractor within the proposed development shall guarantee their work for a period of two (2) years after the date of final acceptance by the City of all public improvements. Maintenance bonds shall be in an amount equal to 25 percent of thc construction costs of the improvements within public right-of-way or easements. This includes excavation/fill for public streets. * The City of Grapcvine's Construction Inspector overtime policy allows the Contractor to work from 7 a.m. to 7 p.tn., Monday through Saturday. No work is allowed on Sundays. Overtime charges of $25 per hour shall be paid to the City by the Contractor for work outside the norrnat work week (i.e. 8 a.m. to 5 p.m., Monday through Friday). Saturday work requires a four (4) hour minimum overtime charge. O: ~le~ e. llict I,lana97~ Pat ri,-n. Rv I